Skip to main content

Mexico-Puebla highway second level build from early 2014

Construction of Mexico-Puebla highway’s second level will start in early 2014, according to the head of the Communications and Transport Ministry, Gerardo Ruiz Esparza. Meanwhile, the Secretariat of Communications and Transport in Mexico has opened an international tender process for the construction of the Siglo XXI road in the Morelos state. Those interested in taking part in the process have until 12 June 2013 to buy the tender's terms and conditions. The new contract involves the construction, operation
May 3, 2013 Read time: 1 min
Construction of Mexico-Puebla highway’s second level will start in early 2014, according to the head of the Communications and Transport Ministry, Gerardo Ruiz Esparza.

Meanwhile, the Secretariat of Communications and Transport in Mexico has opened an international tender process for the construction of the Siglo XXI road in the Morelos state. Those interested in taking part in the process have until 12 June 2013 to buy the tender's terms and conditions.

The new contract involves the construction, operation, administration and maintenance of the Siglo XXI road between Jantetelco and El Higueron, which spans 61.8km, over a period of 30 years. Investments are estimated at US$ 197.73 million (MXN 2.4bn). The deadline for bids is 26 September 2013, whereas works are expected to begin on 23 January 2014 and reach completion two years later.

Related Content

  • Early bird deadline close for ASECAP Days
    March 21, 2025
    Check out the event before April 2 and take advantage of the early bird registration fee for the 52nd ASECAP Days to be held at the NH Collection Madrid Eurobuilding hotel in the Spanish capital Madrid.
  • US$410mn ADB loan to build second Vietnam Southern Highway
    August 14, 2013
    The Asian Development Bank (ADB) is to lend US$410 million to Vietnam for the construction of the Second Southern Highway that links Ho Chi Minh City and the Mekong Delta. The arterial highway will consist of two cable-stayed bridges measuring a total of 5km, and 26km of interconnecting roads and associated access. The interconnecting roads and two bridges are expected to reduce the three-and-a-half hour travel time between Long Xuyen and Ho Chi Minh City by an hour, while the 90-minute travel time between
  • Russian road-building industry on verge of massive cuts
    June 10, 2015
    Russia’s road building programme looks set to be cut due to economic issues - Eugene Gerden writes The Russian Government is considering a significant cut to the existing road building programme for the current year. This is due to a current economic crisis in the country, caused by Western sanctions as well as a collapse in the price of oil and gas.
  • US construction machine exports remain low
    September 1, 2016
    According to the US-based Association of Equipment Manufacturers (AEM), exports of machines from the US remain at a low level. The AEM’s analysis shows that exports of US-made construction equipment were down 24% overall at midyear 2016 compared to the first half of 2015. In all machines worth US$5.65 billion were shipped to global markets.