Skip to main content

Metrostav and Bertelsen & Garpestad in E8 deal

The Norwegian project includes 10km of new road and an 870m-long bridge across the Ram Fjord, part of the European route E8 between Norway and Finland.
By David Arminas June 9, 2023 Read time: 2 mins
Construction of the bridge and highway is expected to start at the beginning of next year and end in July 2026 (image courtesy Norwegian Public Roads Administration - Statens vegvesen)

A consortium of Metrostav Norway and Bertelsen & Garpestad have won the main contract for a section of the E8 highway between Sørbotn and Laukslett.

The project includes 10km of new road, an 870m-long bridge across the Ram Fjord as well as several smaller bridges. Construction is expected to start at the beginning of next year and end in July 2026.

The Metrostav Norway consortium’s bid was chosen over those from NCC Norway and the consortium of Hæhre and PNC.

The E8 is a 1,410km European route that goes from Tromsø, Norway, to Turku in Finland and includes five tunnels – and is notable for difficult winter conditions. Tromsø, with a population of just under 80,000, is Norway’s largest northern city – and 355km north of the Arctic Circle. Turku, a city of 200,000, is located at the mouth of the Aura river in the southwest corner of Finland.

Both Indre Laukslett and Sørbotn are villages on the edge of Ram Fjord, with Laukslett being north of Sørbotn and about 22km south of Tromsø. The E8 project between Indre Laukslett and Sørbotn will cost around €195 million, according to Nordisk Tillväxt, a strategic planning and pre-construction consultancy operating across the Nordics. It provides support throughout pre-qualification, tender and bid processes.

The 10m-wide Sørbotn and Laukslett section of the E8 will have avalanche protection at critical points and a reindeer crossing near Sørbotn will be constructed.

Seafill work for bridge pilings has already been tendered.

For more information on companies in this article

Related Content

  • Loaders assist in Chinese concrete production facility
    September 8, 2014
    A fleet of wheeled loaders is playing an important role at a site producing concrete in China. Located at Lintong in Shaanxi Province, in China, the site is producing concrete using gravel from river plains. Lintong lies 35km to the east of Xi’An in western China, the site of the famous Terracotta Army. This new army of SDLG wheeled loaders meanwhile is being used to load gravel from the nearby river plains for Jinsheng Concrete, which sits on the 800km Wei River.
  • Turkey to tender for Izmir-Candarli beltway contract
    November 15, 2016
    Turkish highway authorities will tender construction of the remaining part the Izmir-Menemen-Aliaga-Candarli motorway on 15 February. The contract will be build-operate-transfer for the 76km section between the towns of Aliaga and Candarli. Constructions is expected to take three years. The 16km section between Izmir and Menemen is already finished, according to Turkish media. Up to 60,000 vehicles a day are projected to use the highway from Izmir to Candarli. It is officially called the Otoyol 30
  • Key French highway upgrade deal for consortium
    March 5, 2012
    The French Government has agreed a highway contract with consortium Atlandes for a section of the A63 autoroute in southwest France.
  • €261 million Slovakia road works
    July 17, 2025
    A €261 million Slovakia road project is going ahead.