Skip to main content

Metrostav and Bertelsen & Garpestad in E8 deal

The Norwegian project includes 10km of new road and an 870m-long bridge across the Ram Fjord, part of the European route E8 between Norway and Finland.
By David Arminas June 9, 2023 Read time: 2 mins
Construction of the bridge and highway is expected to start at the beginning of next year and end in July 2026 (image courtesy Norwegian Public Roads Administration - Statens vegvesen)

A consortium of Metrostav Norway and Bertelsen & Garpestad have won the main contract for a section of the E8 highway between Sørbotn and Laukslett.

The project includes 10km of new road, an 870m-long bridge across the Ram Fjord as well as several smaller bridges. Construction is expected to start at the beginning of next year and end in July 2026.

The Metrostav Norway consortium’s bid was chosen over those from NCC Norway and the consortium of Hæhre and PNC.

The E8 is a 1,410km European route that goes from Tromsø, Norway, to Turku in Finland and includes five tunnels – and is notable for difficult winter conditions. Tromsø, with a population of just under 80,000, is Norway’s largest northern city – and 355km north of the Arctic Circle. Turku, a city of 200,000, is located at the mouth of the Aura river in the southwest corner of Finland.

Both Indre Laukslett and Sørbotn are villages on the edge of Ram Fjord, with Laukslett being north of Sørbotn and about 22km south of Tromsø. The E8 project between Indre Laukslett and Sørbotn will cost around €195 million, according to Nordisk Tillväxt, a strategic planning and pre-construction consultancy operating across the Nordics. It provides support throughout pre-qualification, tender and bid processes.

The 10m-wide Sørbotn and Laukslett section of the E8 will have avalanche protection at critical points and a reindeer crossing near Sørbotn will be constructed.

Seafill work for bridge pilings has already been tendered.

For more information on companies in this article

Related Content

  • Advances in road markings
    March 16, 2012
    Recent months have seen many major and vital road marking projects and products completed and tested in different parts of the world. Guy Woodford looks at some of them in Europe, North America, the Middle East and Africa. The London borough of Kensington and Chelsea now has one of the most dramatic streetscape designs in Europe. Exhibition Road’s striking chequered granite design, featuring a single surface running from South Kensington Station to Hyde Park and the full width of the road from building to b
  • Danish-German Fehmarn Belt road and rail tunnel hits funding snag
    July 9, 2015
    A Danish newspaper has learned of a significant European Union funding gap for one of Europe’s most ambitious transportation road and rail projects. The Fehmarn Belt Fixed Link would connect the German island of Fehmarn with the Danish island of Lolland. A submersed tunnel will cross the 18km-wide Fehmarn Belt, or Fehmarn Strait, in the Baltic Sea. Last February news emerged that contractors had revamped their cost estimates, adding nearly €1.2 billion to the project. This put the final cost of the 18
  • Work starting on Norway’s mega-tunnel project
    January 5, 2018
    Construction is now commencing on Norway’s Rogfast tunnel mega-project on the E39 route between Bergen and Stavanger. The project will cost around €1.8 billion to construct according to some estimates. The new project will set several world records as it will be the longest and deepest undersea road tunnel ever constructed, measuring 27.3km and reaching a maximum 392m below the sea bed. Once the new tunnel opens to traffic in 2025 or 2026 it will reduce the travel time between Bergen and Stavanger, in the
  • VIDEO: Kolin-Kalyon and Limak-Cengiz win North Marmara connector tenders
    May 23, 2016
    Turkey has awarded the much-delayed tenders for the motorway connector roads to Istanbul’s Third Bosphorus Bridge.

    The 90km motorway section between Kinali and Odayeri was awarded to the Kolin-Kalyon joint-venture with completion in seven years and nine months, according to Turkish media reports. The 170km section between Kurtkoy and Akyazi was awarded to Limak-Cengiz joint-venture which will finish the work in six years and nine months.