Skip to main content

Metrostav and Bertelsen & Garpestad in E8 deal

The Norwegian project includes 10km of new road and an 870m-long bridge across the Ram Fjord, part of the European route E8 between Norway and Finland.
By David Arminas June 9, 2023 Read time: 2 mins
Construction of the bridge and highway is expected to start at the beginning of next year and end in July 2026 (image courtesy Norwegian Public Roads Administration - Statens vegvesen)

A consortium of Metrostav Norway and Bertelsen & Garpestad have won the main contract for a section of the E8 highway between Sørbotn and Laukslett.

The project includes 10km of new road, an 870m-long bridge across the Ram Fjord as well as several smaller bridges. Construction is expected to start at the beginning of next year and end in July 2026.

The Metrostav Norway consortium’s bid was chosen over those from NCC Norway and the consortium of Hæhre and PNC.

The E8 is a 1,410km European route that goes from Tromsø, Norway, to Turku in Finland and includes five tunnels – and is notable for difficult winter conditions. Tromsø, with a population of just under 80,000, is Norway’s largest northern city – and 355km north of the Arctic Circle. Turku, a city of 200,000, is located at the mouth of the Aura river in the southwest corner of Finland.

Both Indre Laukslett and Sørbotn are villages on the edge of Ram Fjord, with Laukslett being north of Sørbotn and about 22km south of Tromsø. The E8 project between Indre Laukslett and Sørbotn will cost around €195 million, according to Nordisk Tillväxt, a strategic planning and pre-construction consultancy operating across the Nordics. It provides support throughout pre-qualification, tender and bid processes.

The 10m-wide Sørbotn and Laukslett section of the E8 will have avalanche protection at critical points and a reindeer crossing near Sørbotn will be constructed.

Seafill work for bridge pilings has already been tendered.

For more information on companies in this article

Related Content

  • VIDEO: Successful explosive bridge demolition in Kentucky
    July 28, 2016
    A successful explosive bridge demolition job has been carried out in the US State of Kentucky. After a short delay, demolition specialists managed to remove the old Eggners Ferry Bridge successfully and without incident. The explosives broke up the four middle spans of the structure. The demolition job was not without its challenges, with concern over the presence of nesting ospreys on the structure. Demolition personnel had to keep a distance of 90m from the nesting area, which delayed preparations.
  • Norway road tenders being planned
    June 2, 2020
    Norwegian road tenders are being planned.
  • Bentley Systems gives software awards for excellence in bridge and road construction
    November 1, 2013
    Software specialist Bentley Systems awarded key road and bridge construction projects for excellence in the use of its software. The awards were presented at the firm’s annual event, this year held at the Metropole Hotel in UK capital London.
  • Norway: landslide closes bridge amid concerns for infrastructure
    February 12, 2015
    A bridge carrying one of Norway’s busiest motorways remains closed after a major earth slide severely damaged its supporting columns this week. The bridge closure comes as Norway’s Public Roads Administration said it is concerned about the condition of 104 bridges throughout the country, although they remain safe to use. Two of the foundation pillars of the bridge at Holmestrand, along the Highway E-18 through Vestfold County, were affected and dropped a span by up to 1.5m, creating a severe dip and crack