Skip to main content

Metrorex plans new Bucharest underground link

Bucharest underground operator Metrorex has nearly finished plans to develop its new US$1.35billion M6 underground mainline to link the city centre with Henri Coanda International Airport. The new M6 in the Romanian capital will have a length of 14km and take in 12 stations. Metrorex has changed the initial project plans by adding two new stations to cover the residential area and Baneasa Commercial Park.
May 15, 2012 Read time: 1 min
Bucharest underground operator 5546 Metrorex has nearly finished plans to develop its new US$1.35billion M6 underground mainline to link the city centre with Henri Coanda International Airport.

The new M6 in the Romanian capital will have a length of 14km and take in 12 stations. Metrorex has changed the initial project plans by adding two new stations to cover the residential area and Baneasa Commercial Park.

According to local authorities, the new trains on the M6 line will be fitted with passenger information display systems that will provide information in Romanian and a number of other languages about the schedule of airlines and the city of Bucharest.

The new line M6 will become operational in 2017-2018. The tender procedures will be launched on 3 September 2012. Consultants for the project are: 5547 Padeco and 1426 Oriental Consultants of Japan; Metroul Romanial; 5548 Seneca Group International ; and 5549 Systra of France.

For more information on companies in this article

Related Content

  • Colombia road and tunnel connection to Medellin Airport
    September 13, 2017
    Work is well underway on a new road and tunnel project, which will provide an improved connection between the Colombian city of Medellin and its airport. The new link will measure 24km long in all and the construction work is expected to cost over US$342 million, with completion due at the end of 2018. The project is known overall as the Oriente Tunnel, with the work being carried out as a concession by Concesion Tunel Aburrá-Oriente. The project comprises four sections in all. These are the 786m Seminario
  • Making the U-turn
    August 2, 2012
    Political hostility to a toll road project in Australia has been turned around by the quality and amenity of the project writes Adrian Greeman Cars, trucks and vans were taking to the new EastLink toll road in Melbourne with enthusiasm this July, pleased to try out its 39km route for time and cost savings. As well as the convenience of the uncongested route, drivers were also able to view an extraordinary multi-shaded perspective of transparent green and orange noise wall panels, burnt earth-coloured retai
  • Opinions strong on VMS application
    September 26, 2013
    The captains of the motorway squad of Issoire and Clermont l’Hérault said the signs are very legible and understandable but they would have preferred the signs to be mounted on gantries. The law forces also pointed out that the signs are situated on the plains, so the relationship with the traffic conditions in mountains is difficult to make and a reminder near the difficulties would be preferable. Local drivers rely on the signs and change their travel plans and routes accordingly while non-locals ask
  • Istanbul’s new airport benefits from Wirtgen Group machines
    November 22, 2017
    Construction of Istanbul’s new airport facility is benefiting from the use of a large fleet of machines from the Wirtgen Group. When it is complete, this will be the world’s largest airport and will be able to handle 150-200 million passengers/year as well as 6 million tonnes of freight/year. This will make the facility substantially larger than the world’s current largest airport, the Hartsfield-Jackson Atlanta International Airport, which handles around 105 million passengers/year.