Skip to main content

Metrorex plans new Bucharest underground link

Bucharest underground operator Metrorex has nearly finished plans to develop its new US$1.35billion M6 underground mainline to link the city centre with Henri Coanda International Airport. The new M6 in the Romanian capital will have a length of 14km and take in 12 stations. Metrorex has changed the initial project plans by adding two new stations to cover the residential area and Baneasa Commercial Park.
May 15, 2012 Read time: 1 min
Bucharest underground operator 5546 Metrorex has nearly finished plans to develop its new US$1.35billion M6 underground mainline to link the city centre with Henri Coanda International Airport.

The new M6 in the Romanian capital will have a length of 14km and take in 12 stations. Metrorex has changed the initial project plans by adding two new stations to cover the residential area and Baneasa Commercial Park.

According to local authorities, the new trains on the M6 line will be fitted with passenger information display systems that will provide information in Romanian and a number of other languages about the schedule of airlines and the city of Bucharest.

The new line M6 will become operational in 2017-2018. The tender procedures will be launched on 3 September 2012. Consultants for the project are: 5547 Padeco and 1426 Oriental Consultants of Japan; Metroul Romanial; 5548 Seneca Group International ; and 5549 Systra of France.

For more information on companies in this article

Related Content

  • Briefly, and to the point
    April 10, 2012
    Duplex A86 tunnel. The low risk found for driving through the tunnel is primarily due to the low volume of traffic of around 11,000 vehicles/day and the ban on HGVs and the transport of hazardous goods.
  • Briefly, and to the point
    May 9, 2012
    The low risk found for driving through the tunnel is primarily due to the low volume of traffic of around 11,000 vehicles/day and the ban on HGVs and the transport of hazardous goods. Unidirectional traffic, sufficiently wide lanes, emergency lanes and lighting are the main reasons for the very good result for preventive measures. The tunnel is monitored around-the-clock in a tunnel control centre manned by trained staff, and incidents are automatically reported to the control centre by video link. If neces
  • High marks for road marking solutions
    December 3, 2013
    A novel solution based on a leading road marking manufacturer’s proven marking technology is keeping elderly residents safe in a French residential development. Guy Woodford reports on this and other major road marking products and their applications By 2050, it is estimated that 45% of European Union citizens will be over 60. Many authorities have been working to develop and implement safety standards that will ensure enhanced mobility for their local elderly population. As part of their implementation,
  • A road challenge for Zimbabwe
    November 8, 2023
    Construction work is finally underway for a major new highway link in Zimbabwe after many years of false starts.