Skip to main content

Metrorex plans new Bucharest underground link

Bucharest underground operator Metrorex has nearly finished plans to develop its new US$1.35billion M6 underground mainline to link the city centre with Henri Coanda International Airport. The new M6 in the Romanian capital will have a length of 14km and take in 12 stations. Metrorex has changed the initial project plans by adding two new stations to cover the residential area and Baneasa Commercial Park.
May 15, 2012 Read time: 1 min
Bucharest underground operator 5546 Metrorex has nearly finished plans to develop its new US$1.35billion M6 underground mainline to link the city centre with Henri Coanda International Airport.

The new M6 in the Romanian capital will have a length of 14km and take in 12 stations. Metrorex has changed the initial project plans by adding two new stations to cover the residential area and Baneasa Commercial Park.

According to local authorities, the new trains on the M6 line will be fitted with passenger information display systems that will provide information in Romanian and a number of other languages about the schedule of airlines and the city of Bucharest.

The new line M6 will become operational in 2017-2018. The tender procedures will be launched on 3 September 2012. Consultants for the project are: 5547 Padeco and 1426 Oriental Consultants of Japan; Metroul Romanial; 5548 Seneca Group International ; and 5549 Systra of France.

For more information on companies in this article

Related Content

  • New Angolan bridge offers improved connectivity
    September 30, 2013
    Drivers in Angola are benefiting from a bridge that spans the Catumbela River, taking the place of an old structure that had proven not fit for purpose. The US$35 million cable stayed bridge is located in the highway between Benguela and Lobito, around 7km from Angola’s Atlantic coast and is one of a series of new infrastructure developments in the country. Angola suffered a long period of war that impacted on its people and infrastructure. The war resulted in severe damage to the country’s road system alon
  • TRA 2014 showcases the best of cutting-edge transport research and thinking
    July 1, 2014
    Despite tight finances due to the current global economic climate, the recent Transport Research Arena (TRA) 2014 show in Paris showed how innovative transport research, largely using cutting-edge ITS, is creating safer and smarter highways of the future. Guy Woodford reports How far can you drive around a car race track with no other vehicles on it on half a glass of fuel while attempting to maintain a speed of 60kph? After taking up the challenge offered by the Eco Driving Simulator using SiVIC (Simulatio
  • The world’s most congested cities ranked
    February 6, 2020
    There is a new ranking for the world’s most traffic-congested cities.
  • Tunnelling challenge on German project
    June 13, 2012
    A massive construction project has been underway deep in the heart of the Schnecktal valley area in Germany. From the surface, though, you would never be able to tell. The majority of the work is underground, as a joint-venture team led by German contractor Wayss and Freytag Ingenieurbau builds the nearly 7km long Finne Tunnel. After a few years of tunnel boring operations, the contractor is at work finishing the interior of the tunnel, slipforming first the tunnel’s floor and then a walkway with its GOMACO