Skip to main content

Messe München tips bauma 2013 to be biggest bauma show ever

Organisers of bauma 2013 say that this year’s event is likely to be the biggest in the history of the bauma show. Between 15th and 21st April, 2013, Messe München will be opening the gates on the world´s largest construction equipment trade show. This year’s event will cover a total of 570,000m² of exhibition space, spread between 16 halls, accounting for 180,000m², and the outdoor exhibition area, offering 390,000m². Over 3,400 exhibitors from 57 countries will be showcasing their innovations at bauma 2013
April 11, 2013 Read time: 2 mins
Organisers of 688 Bauma 2013 say that this year’s event is likely to be the biggest in the history of the bauma show.

Between 15th and 21st April, 2013, 3995 Messe München will be opening the gates on the world´s largest construction equipment trade show.

This year’s event will cover a total of 570,000m² of exhibition space, spread between 16 halls, accounting for 180,000m², and the outdoor exhibition area, offering 390,000m². Over 3,400 exhibitors from 57 countries will be showcasing their innovations at bauma 2013, a rise on the 3,256 exhibitors from 53 countries at bauma 2010. Germany (1,366 exhibitors); Italy (481 exhibitors); and China (323 exhibitors) make up the top three exhibiting countries at bauma 2013.

Already, the number of visitors registering their attendance in advance has risen as compared to the same stage of bauma 2010. Messe München is now expecting over 450,000 visitors to come to the show.

The next generation is a prominent theme of bauma 2013. Covering a 3000m² area, the VDMA 1188 Construction Equipment and Building Material Machinery Association, Messe München and the LandBauTechnik Bundesverband are putting on the first ever extensive programme targeted at young people. The aim of the initiative is to fill young people with enthusiasm for technology and the construction and building material machinery sector in particular.

At the West Entrance, there will be an "International Information Centre Research Live". At this display, the ninth of its kind, 20 universities from Germany and abroad will be presenting the latest results from research and development projects. The event is being organized by the Technical University of Dresden.

Related Content

  • Agreement reached on construction machine data standards
    February 4, 2020
    A new standard is being reached for construction and quarry machine data.
  • The UK’s TRL body is now a corporate member of the IRF Geneva
    August 28, 2013
    As recently announced by the Chair of IRF Geneva, Kiran Kapila, “we are pleased to welcome TRL, the UK’s Transport Research Laboratory, to the IRF family. With its wide-ranging and global road-related research activities, TRL represents a true asset to the IRF membership. We are excited at the prospect of working closely with TRL towards a world of safe, sustainable and efficient roads and road networks.” With over 80 years of knowledge and experience embedded in its history, TRL’s vision is to meet mode
  • Expansion of the Panama Canal
    February 24, 2012
    In Panama, a ten-year US$5 billion project is underway to double the capacity of the Panama Canal Since its completion in 1914 the Panama canal has allowed shipping to cross the 80km wide isthmus at the narrowest part of the Americas. Belgian company Dredging International's D'Artagnan, a self-propelled heavy-duty cutter suction dredger, arrived at the canal, and the latest addition to the Panama Canal Authority's (ACP) expansion dredging fleet then made its way to the Pacific entrance, where it will expa
  • PERI’s VARIOKIT as cantilever equipment takes to bauma stage
    January 6, 2017
    PERI’s VARIOKIT engineering construction kit, being showcased at bauma, is said by the German firm to have already provided cost-effective and flexible solutions for superstructures for several years. From project-specific solutions for tunnels, to system applications in bridge construction and heavy-duty towers for the highest loads, VARIOKIT is extremely adaptable. Now it can also be used for the balanced cantilever method with a few additional, newly developed system components. The new components for t