Skip to main content

Melbourne road development needed to unlock congestion

Melbourne’s growing congestion problem could be reduced significantly if a number of major road projects are initiated. A budget of US$1.67 billion (A$2.2 billion) will be needed for the upgrade works to 13 of the city’s most important road sections. These roads are located in the south-east of the city as well as in the north.
May 8, 2018 Read time: 1 min

Melbourne’s growing congestion problem could be reduced significantly if a number of major road projects are initiated. A budget of US$1.67 billion (A$2.2 billion) will be needed for the upgrade works to 13 of the city’s most important road sections. These roads are located in the south-east of the city as well as in the north.

Related Content

  • Italy road tunnel project excavated
    July 9, 2018
    Italy’s A3 Highway is being upgraded, which will improve transport between Salerno and Calabria. Upgrading Italy’s A3 highway is of prime importance for developing the south of the country and is a project that has been prioritised for construction. The A3 Salerno-Reggio-Calabria highway is a non-toll road managed by ANAS, Italy’s state-owned company that constructs and maintains highways. The route runs a total of 443km, with the road having originally been built between 1966 and 1974. However, the origina
  • Ferrovial consortium picked for Western Roads Upgrade in Melbourne
    November 3, 2017
    Ferrovial’s subsidiary Cintra is part of a joint venture that has been selected as preferred respondent for the Western Roads Upgrade project in western Melbourne. The State of Victoria awarded the deal to Netflow, a joint venture between Plenary and Cintra with a focus on road projects in Australia and New Zealand. The win includes Ferrovial subsidiaries Broadspectrum and Amey taking charge of maintenance on the project worth nearly US$1.4 billion. The overall contract is for the design, construction and
  • Mumbai’s new coastal transport link
    July 6, 2022
    Mumbai’s new coastal road presents an ambitious and challenging project that will help improve the lives of the city’s inhabitants - Mike Woof writes
  • South Eastern Nigerian road project stalls
    July 24, 2019
    Construction work on the upgrade of the road connecting Calabar with Itu and Ikot Ekpene in South East Nigeria has once again ground to a halt. The contractor carrying out the work, Julius Berger, has transferred personnel and equipment to other projects. This action has been taken due to a delay in payments for the work to the contractor. The road is now in extremely poor condition, which is a key problem for transport between Cross River State and Akwa Ibom State. Much of the road is now said to be virt