Skip to main content

Massive highway deal for Wuhan

Construction work is now underway on a massive highway project at Wuhan in China. The US$5.5 billion project is due for completion on 2015 and involves the construction of a four ring highway with a total length of 146km. The highway project is being designed with six traffic lanes in either direction and will have a speed limit of 100km/h.
May 14, 2012 Read time: 1 min
Construction work is now underway on a massive highway project at Wuhan in China. The US$5.5 billion project is due for completion on 2015 and involves the construction of a four ring highway with a total length of 146km. The highway project is being designed with six traffic lanes in either direction and will have a speed limit of 100km/h.

Related Content

  • Nigerian bridge deal awarded
    January 17, 2023
    A major Nigerian bridge deal has been awarded.
  • Eurovia wins US road contracts in North Carolina
    November 2, 2018
    Eurovia has won two major road contracts in the US worth a total of US$480 million. A subsidiary of the French company Vinci Construction, Eurovia will work on design-and-build contracts that will help improve two road corridors in North Carolina. Eurovia’s work on I-485 in Charlotte involves adding a 26km express toll lane in each direction as well as a free high-occupancy-vehicle lane. The project aims to improve traffic conditions on the highway, which is used by 146,000 vehicles/day and suffers severe
  • Chinese key link upgrade
    February 29, 2012
    Upgrading work on China's Hohhot-Baotou highway is now underway in a project worth US$1.5 billion.
  • Ecuador road widening project planned
    July 3, 2018
    A road widening project worth US$134.3 million is now going ahead in Ecuador. The road connecting Aloag with Santo Domingo is being improved along a 100km stretch, widening the route so that it will feature two lanes in either direction instead of the single lane in either direction at present. This will boost the transport connection between Pichincha Province and Santo Domingo de los Tsachilas Province. The contract was originally awarded in 2015 but stalled in 2017 following a disagreement over tolling.