Skip to main content

Massenza redesigns its range of three PMB plants to deliver less clogging and faster production volumes

April 11, 2025 Read time: 2 mins
bauma 2025

Massenza has redesigned all three models in its PMB plant range. Its engineers have changed the design of the mixing tanks to reduce the likelihood of material clogging; reconfigured the medium-sized machine to allow a fast expansion of production volumes; and added control rooms to the two larger models.

The three models in the Massenza PMB plant range are the Smart which can produce between five and 10 tonnes of polymer modified bitumen (PMB) an hour; the Klever which can produce between 10 and 20 tonnes and the SuperKlever which can produce between 25 and 30 tonnes.  

The Smart is an entry-level plant, while the Klever and SuperKlever benefit from more automation and production-reporting capabilities.

The Klever now has space for a second mill to be added so that, if customers find that demand for PMB is ramping up, they can almost double their capacity without having to invest in a whole new plant.

“We were finding that quite a few customers were buying the medium-sized plant and then, after a few years, they needed to produce more so had to buy a second plant. Now they just need to add the second mill,” according to Massenza.

For the Klever and SuperKlever PMB plants, Massenza has added control rooms containing the PLC and screen. Providing cool air in the summer and warm air in the winter, this update aims to make life more comfortable for the plant operators.

“We have already supplied two new-generation plants to Saudi Arabia, one to Romania, one to Albania and one to the UK,” said Massenza. 

For more information on companies in this article

Related Content

  • Pavers providing smooth runway for Saudi Arabia
    October 2, 2014
    Jeddah’s international airport in Saudi Arabia is benefiting from a major revamp to help boost capacity. The King Abdulaziz International Airport (KAIA) near Jeddah has seen a massive increase in passenger numbers in the last 20 years Demand has continued to grow due to both business travel and religious tourism and the KAIA authorities opted to expand the facilities in 2006, in line with anticipated needs. That first phase of the planned expansion is being completed during this year, making KAIA the la
  • Lintec showcases redesigned CSD 1500 plant at bauma
    January 6, 2017
    Especially redesigned to allow hot and cold recycling, Lintec will be showcasing its new CSD 1500 asphalt mixing plant at bauma. With a capacity of 120 tonnes/hour, the new CSD 1500 enables the integration of a hot storage silo with a 50tonne capacity. Similar to all Lintec’s CSD line plants, the aggregates enter the screen drum through the front wall.
  • Environmental impact drives warm mix growth
    November 14, 2012
    Warm mix asphalt can save energy and the environment, cutting emissions of carbon dioxide and other harmful gases, but are environmental arguments enough for clients and contractors? Kristina Smith asks Though popular in the United States, warm mix asphalt is still a technology waiting to happen in the rest of the world. Chemical companies who imagined a meteoric rise in sales are still waiting for the right economic conditions to allow warm mix to start taking serious market share from hot mix. “In Europe
  • Green asphalt options from Ammann's new plants
    March 6, 2024
    Ammann is offering innovative advances for the asphalt plant segment - Mike Woof writes