Skip to main content

Massenza redesigns its range of three PMB plants to deliver less clogging and faster production volumes

April 11, 2025 Read time: 2 mins
bauma 2025

Massenza has redesigned all three models in its PMB plant range. Its engineers have changed the design of the mixing tanks to reduce the likelihood of material clogging; reconfigured the medium-sized machine to allow a fast expansion of production volumes; and added control rooms to the two larger models.

The three models in the Massenza PMB plant range are the Smart which can produce between five and 10 tonnes of polymer modified bitumen (PMB) an hour; the Klever which can produce between 10 and 20 tonnes and the SuperKlever which can produce between 25 and 30 tonnes.  

The Smart is an entry-level plant, while the Klever and SuperKlever benefit from more automation and production-reporting capabilities.

The Klever now has space for a second mill to be added so that, if customers find that demand for PMB is ramping up, they can almost double their capacity without having to invest in a whole new plant.

“We were finding that quite a few customers were buying the medium-sized plant and then, after a few years, they needed to produce more so had to buy a second plant. Now they just need to add the second mill,” according to Massenza.

For the Klever and SuperKlever PMB plants, Massenza has added control rooms containing the PLC and screen. Providing cool air in the summer and warm air in the winter, this update aims to make life more comfortable for the plant operators.

“We have already supplied two new-generation plants to Saudi Arabia, one to Romania, one to Albania and one to the UK,” said Massenza. 

For more information on companies in this article

Related Content

  • Success of hot mix asphalt road recycling
    March 7, 2012
    Russian construction firm Kamdorstroy has carried out a successful demonstration of recycling techniques to over 60 highway officials, academics and contractors from all over the CIS states. The demonstration was carried out in co-operation with the Russian Federal Highway and Tatarstan Highway authorities and involved milling, recycling and overlaying a road with hot mix asphalt. The work was carried out on a 7.5m wide roadway with 3.8m wide lanes (with an overlap) using machinery and techniques new to Rus
  • Innovative advances in warm Mix Asphalts
    February 1, 2013
    Rising energy costs and increased awareness of safety and environmental issues have encouraged the development of Warm Mix Asphalts (WMA), which are typically produced at temperatures of between 130°C and 145°C, compared with around 175°C for traditional Hot Mix Asphalt (HMA). WMAs are regularly used in many European countries, as well as both North and South America. The three most common ways to lower the working temperature of asphalt are: a) foaming technologies; b) wax additives; and c) chemical (surfa
  • Terex Finlay welcomes market buoyancy
    March 9, 2017
    Terex Finlay is looking to capitalise on healthy North American demand for premium crushing and screening equipment. “The North America market has been very buoyant for us and it’s growing every year,” said Alan Witherow, Terex Finlay’s product manager. “Talking to some of our dealers on the first day-and-a-half of the show, the mood is very positive.”