Skip to main content

Massenza redesigns its range of three PMB plants to deliver less clogging and faster production volumes

April 11, 2025 Read time: 2 mins
bauma 2025

Massenza has redesigned all three models in its PMB plant range. Its engineers have changed the design of the mixing tanks to reduce the likelihood of material clogging; reconfigured the medium-sized machine to allow a fast expansion of production volumes; and added control rooms to the two larger models.

The three models in the Massenza PMB plant range are the Smart which can produce between five and 10 tonnes of polymer modified bitumen (PMB) an hour; the Klever which can produce between 10 and 20 tonnes and the SuperKlever which can produce between 25 and 30 tonnes.  

The Smart is an entry-level plant, while the Klever and SuperKlever benefit from more automation and production-reporting capabilities.

The Klever now has space for a second mill to be added so that, if customers find that demand for PMB is ramping up, they can almost double their capacity without having to invest in a whole new plant.

“We were finding that quite a few customers were buying the medium-sized plant and then, after a few years, they needed to produce more so had to buy a second plant. Now they just need to add the second mill,” according to Massenza.

For the Klever and SuperKlever PMB plants, Massenza has added control rooms containing the PLC and screen. Providing cool air in the summer and warm air in the winter, this update aims to make life more comfortable for the plant operators.

“We have already supplied two new-generation plants to Saudi Arabia, one to Romania, one to Albania and one to the UK,” said Massenza. 

For more information on companies in this article

Related Content

  • Asphalt compaction seeing major technical advances
    August 24, 2016
    Key innovations in asphalt compaction will help improve overall paving quality - Mike Woof writes
  • Nynas and Shell in Hanson UK bio-binder trial
    March 6, 2023
    Hanson UK is using Nynas’s biogenic binder Nypol RE in one asphalt mixture and Shell’s new bio-component binder Cariphalte CarbonSink in the second mix.
  • A fresh breath of air
    July 16, 2012
    With a new wave of exhaust emission regulations coming shortly, engine manufacturers are well on track to develop new solutions as Mike Woof reports A wave of technological advances has made the current generation of diesels the cleanest industrial engines ever produced. Driven by tightening controls on emissions, manufacturers have had to develop an array of innovative solutions that will help cut particulate and NOx being emitted from the tailpipe. When the phased reduction in exhaust emissions was first
  • New low emission, versatile asphalt plant from Marini
    February 11, 2013
    Marini’s new eTOWER asphalt plants are said to complete the firm’s Top Tower line-up. The existing Top Tower plants offer capacities of 280-400tonnes/hour and the eTOWER machines are designed with output of 150 and 180tonnes/hour. The units benefits from features used in the Top Tower range such as the drying/filtering tower system. This features as innovative location for the filter and under-filter hopper, above the dryer drum, which is said to help reduce energy consumption. This modular plant can be sup