Skip to main content

March 2016

A Nordic approach to road repairs for London
May 10, 2016 Read time: 1 min

A Nordic approach to road repairs for London.

Related Content

  • London’s Westminster Council goes for gully offenders
    February 8, 2018
    Increasing numbers of blocked road drains and gullies has forced London’s Westminster City Council to take a tough stand with offenders The council maintains 16,500 gullies. Around 95% of a gully’s content is natural and can be recycled: taken away to road contractor FM Conway’s drainage treatment plant. Material is separated into solids, organics and water and reused as aggregates and materials in their wider construction business.
  • Thames Crossing tunnels tendered
    November 13, 2020
    The Crossing will almost double road capacity across the Thames River near London.
  • Yorkshire Water’s time-saving 3M manhole cover repair kit
    September 26, 2013
    A novel application for an existing 3M product has given Yorkshire Water a time-saving manhole cover repair solution. When staff at the company, which maintains just under 1,000kms of water and sewerage pipework, and deploys a team of street furniture operatives to deal with reports of damaged covers, realised that in many cases the manhole cover frame was compliant but the lid had dropped within, they approached 3M to discuss a solution that would avoid excavations and time-consuming replacements. “W
  • Successful pavement maintenance
    February 16, 2012
    This is the final section of a three-part series about preventive maintenance for pavements. Written by Alan S. Kercher, P.E., Kercher Engineering, Inc