Skip to main content

March 2013

Road signs provide drivers with vital route information that can be understood clearly - photo courtesy of World Highways reader Walter Haberlein
April 10, 2013 Read time: 1 min
Road signs provide drivers with vital route information that can be understood clearly - photo courtesy of World Highways reader Walter Haberlein

Related Content

  • Driver feedback signs cut speeding
    March 2, 2012
    Technology from 3M is helping reduce the incidence of speeding in the UK city of Salford. A series of Driver Feedback Signs from 3M, DFS 700 units, have been installed in the area to gather both information on average vehicle speeds and encourage drivers to observe the speed limits. The Urban Vision partnership between Salford City Council and Capita Symonds manages the local highways on behalf of the council and has installed 50 of the DFS 700 units in strategic locations close to schools, the entrances to
  • Opinions strong on VMS application
    September 26, 2013
    The captains of the motorway squad of Issoire and Clermont l’Hérault said the signs are very legible and understandable but they would have preferred the signs to be mounted on gantries. The law forces also pointed out that the signs are situated on the plains, so the relationship with the traffic conditions in mountains is difficult to make and a reminder near the difficulties would be preferable. Local drivers rely on the signs and change their travel plans and routes accordingly while non-locals ask
  • Right ways to deter wrong-way
    August 6, 2020
    After research, California’s Caltrans is reviewing its highway design standards.
  • UK Highways Agency unveils additional spending plans
    April 12, 2013
    In the UKL the Highways Agency has announced plans for an additional 58 schemes intended to boost the economy, reduce congestion and improve safety. These schemes form part of the third, and final, stage of the Highways Agency’s pinch point programme. The 58 schemes represent an investment of €114.6 million (£98 million) and are intended to remove bottlenecks and keep traffic moving on England’s motorways and major A roads. They will be delivered by March 2015 and will bring an estimated €1.64 billion (£1.4