Skip to main content

March 2012

Cost cutting in sign design can lead to confusion: Image provided courtesy of World Highways reader Helen Marais
April 20, 2012 Read time: 1 min
Cost cutting in sign design can lead to confusion: Image provided courtesy of World Highways reader Helen Marais

Related Content

  • Fehmarn Belt Tunnel opening set for mid-2029
    August 16, 2024
    Around 1,500 tonnes of reinforcement for casting the concrete tunnel elements are produced weekly for the 17.6km Fehmarn Belt Tunnel that will connect the Danish island of Lolland with the German island of Fehmarn.
  • IBT goes roundabout in Bradenton, Florida
    November 26, 2019
    Another roundabout is being built in the US where the public remains sceptical but agencies and contractors are on board, writes David Armina
  • Innovative paving techniques being utilised
    February 15, 2021
    Innovative warm mix materials are now being offered by key contractors to deliver longer surface life combined with more sustainable operations
  • Cowi wins Massey Tunnel design
    July 22, 2022
    Cowi has won a contract as owner's engineer for an eight-lane replacement immersed tunnel under the Fraser River near the Pacific coast city of Vancouver. Cowi said it will draw on its experience designing the original four-lane George Massey Tunnel in 1959 and whose removal the engineering firm will later oversee.