Skip to main content

Mantovanibenne shows redesigned shear

Mantovanibenne has increased the cylinder size on its latest Eagle II range of shears and redesigned the tip with a replaceable blade that pierces the material before searing back towards the throat while the one jaw is scalloped to release cut material. On display at bauma was the SH550 Eagle II, which fits carriers in the 50-65tonne range (39-45tonne if boom-mounted) and has a maximum opening of 760mm. The range goes up to the SH2000R, which suits machines upwards of 100tonnes with a 1.2m maximum opening
January 6, 2017 Read time: 2 mins
Mantovanibenne’s new shears pierce the material before cutting.
1140 Mantovanibenne has increased the cylinder size on its latest Eagle II range of shears and redesigned the tip with a replaceable blade that pierces the material before searing back towards the throat while the one jaw is scalloped to release cut material  

On display at 688 Bauma was the SH550 Eagle II, which fits carriers in the 50-65tonne range (39-45tonne if boom-mounted) and has a maximum opening of 760mm.  

The range goes up to the SH2000R, which suits machines upwards of 100tonnes with a 1.2m maximum opening, down to the SH25R for four to six tonne excavators with a maximum opening of 195mm.

Also on show is the company’s CRH440 cracker, with a patented triple booster pump design to increase the available crushing force. According to the company, the design is very powerful for its size and the double pivot design increases the jaw opening relative to the size of the unit.

%$Linker: 2 Asset <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 44293 0 oLinkExternal www.Mantovanibenne.com www.Mantovanibenne.com false /EasySiteWeb/GatewayLink.aspx?alId=44293 false false%>

For more information on companies in this article

Related Content

  • Eagle Iron Works develops Mark VI systems control for sand tanks
    January 6, 2017
    Eagle Iron Works has developed ways to make its system controls even simpler for customers, and a series of changes to its line of Mark V controls for its sand classifying tanks have led to the development of the Mark VI line. Improvements to the operating system include improving accuracy and simplicity of the calibration process allowing the operator to quickly and easily make adjustments to product calibration if the projected sample gradation and the actual sample graduation from the stockpile are not
  • Eagle Iron Works develops Mark VI systems control for sand tanks
    January 23, 2014
    Eagle Iron Works has developed ways to make its system controls even simpler for customers, and a series of changes to its line of Mark V controls for its sand classifying tanks have led to the development of the Mark VI line. Improvements to the operating system include improving accuracy and simplicity of the calibration process allowing the operator to quickly and easily make adjustments to product calibration if the projected sample gradation and the actual sample graduation from the stockpile are not
  • New heavy lift crawler crane from Sany
    January 6, 2017
    Sany America is offering a new 500 tonne class crawler crane aimed to fill a gap in its range that suits duties in infrastructure projects. The Sany SCC8500 is well-suited for construction of 100m wind towers and placing 2.5MW nacelles. The SCC8500 can make these lifts with a straight boom and an offset wind tip, with no need for a back mast. With a full complement of attachments and options, including fixed jib, luffing jib and the SANY UltraLift package, the SCC8500 can also be used in infrastructure proj
  • New heavy lift crawler crane from Sany
    January 31, 2013
    Sany America is offering a new 500 tonne class crawler crane aimed to fill a gap in its range that suits duties in infrastructure projects. The Sany SCC8500 is well-suited for construction of 100m wind towers and placing 2.5MW nacelles. The SCC8500 can make these lifts with a straight boom and an offset wind tip, with no need for a back mast. With a full complement of attachments and options, including fixed jib, luffing jib and the SANY UltraLift package, the SCC8500 can also be used in infrastructure proj