Skip to main content

A major new toll link will boost Indonesia’s transport connections

Construction work on the 13.6km Gempol Pandaan toll road in East Java is commencing. The US$174.5 million project will take 18 months to complete and is expected to open for traffic in the third quarter of 2013.
April 10, 2012 Read time: 1 min
Construction work on the 13.6km Gempol Pandaan toll road in East Java is commencing. The US$174.5 million project will take 18 months to complete and is expected to open for traffic in the third quarter of 2013.

Related Content

  • Indonesia toll road opening to traffic
    February 26, 2019
    Work is on track for the building of a key toll road project in Indonesia’s East Kalimantan. The 99.35km toll road runs between Samarinda and Balikpapan and will cut the travel time between the two from three hours to just one hour. The project is costing US$653.2 million to carry out. Work is almost complete for the stretches from Muara Jawa to Palaran and from Samboja to Muara Jawa sections. The section from Balikpapan to Samboja should be ready by April 2019 and the stretch from Samarinda to Palaran shou
  • UK’s M6 tolled motorway for sale
    June 21, 2016
    For sale: one UK toll motorway along with operating business. Well maintained. Price negotiable. David Arminas looks at what is on offer As if right on cue, a French articulated truck starts to back up along the hard shoulder at an exit area of M6toll. The manoeuvring is watched from an office inside the nearby M6toll headquarters. Inside, Andy Pearson, chief executive of M6toll, glances over his shoulder and interrupts his presentation to World Highways. “He’s probably missed the dedicated wide-load
  • €1 billion tunnel for Genoa port
    March 6, 2024
    Construction is underway for Genoa’s €1 billion port tunnel.
  • Indonesia toll roads being built
    September 2, 2015
    Key highway projects are being planned for Indonesia. The Indonesian firm Wijaya Karya (Wika) will work on three toll road projects in the country worth just over US$922 million. The projects are for the Samarinda-Balikpapan, Manado-Bitung and the Soreang-Pasirkoja routes. The firm hopes to fund the projects using a mix of state and private funding. Meanwhile the toll road operator Jasa Marga is working on securing the funding it needs to finance work on the Kertosono-Ngawi-Solo section of the Transjava Hig