Skip to main content

A major highway project is moving forward in New Zealand

Plans are moving ahead for New Zealand's Transmission Gully highway project. The country’s Environmental Protection Agency has given its final approval for the construction of the 27km Transmission Gully project, which is expected to cost in the region of US$732.4 million (NZ$930 million). The project will be the largest road deal in Wellington region since the late 1970s and one of the largest infrastructure projects in New Zealand.
June 28, 2012 Read time: 1 min
Plans are moving ahead for New Zealand's Transmission Gully highway project. The country’s Environmental Protection Agency has given its final approval for the construction of the 27km Transmission Gully project, which is expected to cost in the region of US$732.4 million (NZ$930 million). The project will be the largest road deal in Wellington region since the late 1970s and one of the largest infrastructure projects in New Zealand. The project is due for completion by 2021 and will likely include a road cut through the hills from Linden to State 1 Highway, north of Paekakariki. According to estimates, the route should reduce the time for journeys in and out of Wellington during peak hours by 10 minutes.

Related Content

  • Major UK tunnel project proposed
    August 19, 2016
    The UK’s Department for Transport (DfT) has put forward five alternate route options for a new highway connecting the cities of Manchester and Sheffield. The project looks likely to include a major tunnel section measuring as much as 20-30km in length that would run under the Peak District. The aim of the project would be to cut journey times between the two cities as the existing transport routes are prone to peak period congestion and delays at present. The route would connect either the M60 or M67 motorw
  • New Zealand expressway opening shortly
    October 7, 2019
    A 15km stretch of the Waikato Expressway project in New Zealand will open to traffic at the beginning of 2020. Building the expressway has taken five years and comes with a total pricetag of US$262.7 million (NZ$408 million). The final section of the route will be open in late 2021 and will bypass the city of Hamilton.
  • Construction of Fehmarn Belt Link could start in 2019
    February 27, 2018
    Construction of a Fehmarn Belt Link could start a year from now – more than a year ahead of schedule, according to Danish media reports. The timing was put forward by Holger Schou Rasmussen, chairman of Femernbælt Development, and Kristian Pihl Lorenzen, the Liberal Party spokesman for traffic issues. They reportedly said that a pending environmental court case in Germany that has stalled approval by German authorities won’t hold up construction of the 18km crossing as much as had been feared. As late as
  • Safety barriers offer positive workzone protection
    February 10, 2012
    A road project in Utah has benefited from the use of effective barrier protection during construction. *Paul Grant reports An upgraded section of road from 3500 South in West Valley City, Utah, is now open to traffic. The link was completely rebuilt by Utah DoT (UDOT) from the Bangerter Highway to 2700 West, and the road carries traffic from West Valley toward downtown Salt Lake City and the University of Utah. The work added two centre lanes, which are now the first dedicated Bus Rapid Transit lanes in Uta