Skip to main content

Major Canadian toll road extension project awarded

A joint venture formed by SNC Lavalin and Cintra Infrastructure will handle the contract to extend Highway 407 in Canada. This US$974.4 million (C$1 billion) deal was awarded by the authorities in Ontario to a joint-venture called the 407 East Development Group General Partnership and is a partnership between Spanish firm Cintra (a subsidiary of Ferrovial) and Canadian company SNC-Lavalin of Canada. The partnership will build, design and maintain Phase 1 of the new Highway 407 East. The construction work is
May 25, 2012 Read time: 2 mins
Pic: Amin Tabrizi
A joint venture formed by 2482 SNC Lavalin and 930 Cintra Infrastructure will handle the contract to extend Highway 407 in Canada. This US$974.4 million (C$1 billion) deal was awarded by the authorities in Ontario to a joint-venture called the 407 East Development Group General Partnership and is a partnership between Spanish firm Cintra (a subsidiary of 2717 Ferrovial) and Canadian company SNC-Lavalin of Canada. The partnership will build, design and maintain Phase 1 of the new Highway 407 East. The construction work is expected to take 42 months, while the contract is for 30 years. The work will see the toll road extended to Clarington, Ontario. The highway will be extended 22km east to Oshawa from Pickering. Also included is a 10km link to Highway 401. Under the terms of the deal, a 43.23% stake in the concession belongs to Ferrovial while SNC-Lavalin holds 16.77% and the Canadian Pension Plan Investment Board has 40%.

Meanwhile plans are in hand in Canada for repairs to the Gardiner Expressway near Toronto over the next 10 years. The plans call for repair works worth US$147 million (C$150 million) in all. The City of Toronto in Canada will provide some $14.7 million/year (C$15 million/year) during the 10 year period. So far, around $2.94 million (C$3 million) has been spent on maintaining expressway and the spending is set to hit $9.8 million (C$10 million) for 2012. At the same time a solution is being sought with regard to concrete quality issues along the expressway. Some $980,000 (C$1 million) is being spent by the City of Toronto each year to highlight areas where there is a risk of concrete damage due to water penetration.

For more information on companies in this article

Related Content

  • CRCP is first choice for Belgian highway
    November 28, 2012
    Dan Gilkes reports on a Belgian highway upgrade When the Ministry of Public Works in the Belgian State of Flanders decided to reconstruct and resurface 19km of the N49 Antwerp-Knokke Expressway, continuously reinforced concrete paving (CRCP) with an exposed aggregate surface was the natural material choice. Indeed exposed aggregate, with its high grip and low noise benefits, has been the first option for all motorway surfacing work in Belgium since the 1980s. However, the €15.65 million contract is not a li
  • New road projects are being proposed for the Philippines
    January 6, 2017
    Major new highway projects are now underway in the Philippines. The tender process is opening for the Laguna Lakeshore Expressway-Dike project, which will be worth some US$2.59 billion in all. The new expressway will connect Los Banos with Taguig City and when it is complete, will improve journey times from Laguna to Metro Manila by cutting congestion. Just over half of the sum will be used to build the expressway itself, while the rest will be used to construct a new flood control dike as well as to carry
  • Nova Scotia commits to major road spend
    January 17, 2023
    The US$748 million announced is part of a five-year highway improvement plan.
  • Sri Lanka benefiting from external highway investment
    July 16, 2013
    Key highway projects in Sri Lanka are now moving forward. Chinese investment will finance a new tolled highway in Sri Lanka. The project for the US$1.5 billion tolled highway is being handled jointly by China Merchants Hua Jian Highway Investment Company and China Merchants Holdings (International) Company. The agreement is to build and operate the highway over a 25-30 year period, and which will be constructed in four separate phases. The first phase will be from Enderamulla to Ambepussa, with the second f