Skip to main content

Major Canadian toll road extension project awarded

A joint venture formed by SNC Lavalin and Cintra Infrastructure will handle the contract to extend Highway 407 in Canada. This US$974.4 million (C$1 billion) deal was awarded by the authorities in Ontario to a joint-venture called the 407 East Development Group General Partnership and is a partnership between Spanish firm Cintra (a subsidiary of Ferrovial) and Canadian company SNC-Lavalin of Canada. The partnership will build, design and maintain Phase 1 of the new Highway 407 East. The construction work is
May 25, 2012 Read time: 2 mins
Pic: Amin Tabrizi
A joint venture formed by 2482 SNC Lavalin and 930 Cintra Infrastructure will handle the contract to extend Highway 407 in Canada. This US$974.4 million (C$1 billion) deal was awarded by the authorities in Ontario to a joint-venture called the 407 East Development Group General Partnership and is a partnership between Spanish firm Cintra (a subsidiary of 2717 Ferrovial) and Canadian company SNC-Lavalin of Canada. The partnership will build, design and maintain Phase 1 of the new Highway 407 East. The construction work is expected to take 42 months, while the contract is for 30 years. The work will see the toll road extended to Clarington, Ontario. The highway will be extended 22km east to Oshawa from Pickering. Also included is a 10km link to Highway 401. Under the terms of the deal, a 43.23% stake in the concession belongs to Ferrovial while SNC-Lavalin holds 16.77% and the Canadian Pension Plan Investment Board has 40%.

Meanwhile plans are in hand in Canada for repairs to the Gardiner Expressway near Toronto over the next 10 years. The plans call for repair works worth US$147 million (C$150 million) in all. The City of Toronto in Canada will provide some $14.7 million/year (C$15 million/year) during the 10 year period. So far, around $2.94 million (C$3 million) has been spent on maintaining expressway and the spending is set to hit $9.8 million (C$10 million) for 2012. At the same time a solution is being sought with regard to concrete quality issues along the expressway. Some $980,000 (C$1 million) is being spent by the City of Toronto each year to highlight areas where there is a risk of concrete damage due to water penetration.

For more information on companies in this article

Related Content

  • Mostotrest won another tender for building of Moscow-St Petersburg highway
    February 20, 2014
    The award for a key stretch of the Moscow-St Petersburg highway has been awarded - Eugene Gerden writes As expected by analysts, Mostotrest, owned by the Rotenberg brothers, won the tender for the construction of the sixth and longest section of the Moscow-St Petersburg highway. Under the conditions of the tender the company will build 209km of the highway (334-543km), which will pass through the Tver and Novgorod regions of Russia. The cost of construction is 144.6 billion Rubles (US$4.51 billion), 16 bill
  • Oklahoma highway extension underway
    October 5, 2021
    A key Oklahoma highway extension project is well underway.
  • Spanish company OHL intends to tender for Mexican toll projects
    February 26, 2014
    Spanish firm OHL is investing heavily in developing its business operations in Mexico. The firm’s Mexican subsidiary, OHL México, is looking to invest as much as US$1.5 billion in new concessions over the next two years, according to a report from Business News Americas. The firm is keen to win new toll road concessions in Mexico, such as the coming Atizapán-Atlacomulco highway tender. OHL México currently has a stake in the Supervía Poetas tollroad in Mexico City as well as a series of tollroad concessions
  • Chilean highway sale delayed, due to earthquake
    February 9, 2012
    The planned sale of the Autopista Central tolled highway in Chile is being delayed following the country's recent severe earthquake.