Skip to main content

Major Bucharest-Constanta, Romania highway project is completed

The Bucharest-Constanta highway works in Romania have finished following the successful completion of the final Cernavoda-Medgidia and Medgidia-Constanta routes. The major US$427.41 million (RON 1.49bn) project, designed in the 1980s, was stopped several times and restarted due to problems with the feasibility studies, lack of financing and cancellation of the contracts with contractors. Meanwhile, Expert Proiect 2002 has been awarded a contract worth US$224,865.60 (RON 781,800) by the national roads author
December 5, 2012 Read time: 1 min
The Bucharest-Constanta highway works in Romania have finished following the successful completion of the final Cernavoda-Medgidia and Medgidia-Constanta routes.

The major US$427.41 million (RON 1.49bn) project, designed in the 1980s, was stopped several times and restarted due to problems with the feasibility studies, lack of financing and cancellation of the contracts with contractors.

Meanwhile, Expert Proiect 2002 has been awarded a contract worth US$224,865.60 (RON 781,800) by the national roads authority 2870 CNADNR to complete the pre-feasibility study for the South Highway project. The South Highway will link Bucharest and Timisoara cities via Craiova.

For more information on companies in this article

Related Content

  • Restart ahead for Nairobi-Mombasa toll road
    May 16, 2025
    Full feasibility study for the US$3.5bn Nairobi to Mombasa toll road is handed over to Kenya National Highways Authority
  • Feasibility study for Romanian road link project
    February 13, 2015
    The Romanian National Company for Highways (CNADNR) is commissioning a study for an important new road link. The proposed connection would link the existing Sibiu bypass with the Pitesti bypass. Italian firm Spea Ingineria Europea and Romanian firm Tecnic Consulting Engineering have formed a joint venture to handle the €6.5 million feasibility study into the project. The consultancy work is expected to take 17 months to complete. The proposed link would stretch some 120km and is expected to cost around €1.6
  • Brazil’s new road links being planned
    February 2, 2022
    Important new road links are being planned for Brazil.
  • Contract for Romanian highway construction signed
    May 10, 2012
    In Romania the road authorities have signed a deal for the construction of a 22km stretch of highway in a contract worth €91 million. The Portuguese contractor Monte Adriano will construct the section linking Nadlac with Pecica. Romania has pledged to improve and expand its highway network with the construction of new links, and much of the funding for its highway plans has been provided by the European Bank for Reconstruction and Development and the European Investment Bank (EIB).