Skip to main content

Major access route contract

Iron technology solutions provider Saint-Gobain PAM UK has joined forces with Burdens to win a major contract for its ductile iron access covers and gratings.
February 20, 2012 Read time: 1 min
Saint-Gobain PAM UK and Burdens have won a major contract for ductile iron access covers
Iron technology solutions provider 757 Saint-Gobain PAM UK has joined forces with 2850 Burdens to win a major contract for its ductile iron access covers and gratings.

The contract from main contractor 2849 VolkerFitzpatrick is for the £62.5 million (e73 million) East Kent Access Route project in south-east England, and includes more than 1,200 Aquamax gratings.

Burdens’ commitment to the Aquamax range and its capacity to offer to the customer a complete range of materials backed by its service was also a key factor in the contract win.

The contract involves the construction of 8km of dual carriageway as well as a jacked-box structure required to construct 105m of dual carriageway underneath the existing Ramsgate to Canterbury railway line.

VolkerFitzpatrick and 981 Hochtief will be working alongside Kent Highway Services and its agent 1662 Jacobs.

For more information on companies in this article

Related Content

  • Mabey Hire supports the Whorlton Bridge
    June 10, 2025

    Whorlton Bridge in England’s County Durham has had to be closed to traffic while a major programme of works is carried out. Every component is to be removed, refurbished and replaced.

    To facilitate the works, a bespoke catenary system has been installed, with Mabey Hire’s adaptable and modular propping equipment used to construct the temporary structure.

  • Europe closes in on the crossings
    September 27, 2017
    The Mersey Gateway bridge project off England’s west coast passed a milestone recently with the first joining of two of the deck sections. The key segments, as the sections are called, link the north approach viaduct to the north pylon deck span and are the first of four deck-joins scheduled for this summer. In total, there are five sections of bridge deck and approach roads that need to be joined.
  • Germany builds its first major PPI autobahn project
    July 7, 2015
    Rebuilding of one of the oldest motorways in Germany is testing out the possibilities for public-private project road construction reports Adrian Greeman A freshly renovated section of the A8 Autobahn in southern Germany will be watched with some interest this summer as traffic begins driving along its rebuilt carriageway and additional third lanes. That is not because of any special road features, other than a distinctive reddish colour to its concrete surface, but because it is a first fullscale public
  • LagoonHull still on the cards
    February 7, 2022
    A proposed major river development in Hull would include an immersed road tunnel to connect traffic arriving from Europe with the UK’s motorway network.