Skip to main content

Maintenance works package for St Petersburg ring road awarded

The contract for maintenance of the St Petersburg Ring Road has been awarded to PO RosDorStroy. The deal is worth some US$183 million and will run until mid-2018 and the ring road (KAD) has been maintained by PO RosDorStroy since construction commenced. The deal was awarded by the Directorate of St Petersburg Transport Bypass Construction (DSTO).
October 19, 2012 Read time: 1 min
The contract for maintenance of the St Petersburg Ring Road has been awarded to PO RosDorStroy. The deal is worth some US$183 million and will run until mid-2018 and the ring road (KAD) has been maintained by PO RosDorStroy since construction commenced. The deal was awarded by the Directorate of St Petersburg Transport Bypass Construction (DSTO).

Related Content

  • EBRD funding for St Petersburg project?
    April 27, 2012
    The European Bank for Reconstruction and Development (EBRD) intends to provide a US$277 million (€200 million) loan to the Northern Capital Highway consortium, which will build the central 11.5km section of St Petersburg’s Western High Speed Diameter (WHSD) route. The EBRD’s board of directors has said will consider the loan on 14th February 2012. The finance package is of note as Russian road projects have largely found funds from other sources so far. The Northern Capital Highway consortium estimates the
  • St Petersburg sets out road development plan
    July 28, 2015
    St Petersburg Committee’s for Transport Infrastructure Development (KRTI) is setting out a strategy for road infrastructure development. The KRTI says that the city’s road network will be extended from 3,350 to 3,510 km in the 2015-2020 period. Meanwhile the KRTI also hopes to improve the condition of the city’s roads. At present around 30% of the city’s roads are in a poor state but the plans call for this to be reduced to 15% by 202 following the introduction of better road maintenance planning. A major p
  • Norwegian road and tunnel package awarded
    May 12, 2022
    A major Norwegian road and tunnel package has been awarded.
  • Work on St Petersburg bridge project
    June 20, 2016
    Contractor ICA Construction used two Aquajet robotic hydrodemolition machines at the top of a 120m-high bridge pylon located in the city of St Petersburg. The two Aquajet robotic water cutters were used to remove surplus concrete from around the inner steel structure of the bridge pylon. This link spans the River Neva and forms part of the Western High-Speed Diameter (WHSD) route in St Petersburg. The WHSD is a highly important route for the region and will provide a key connection between the Scandinavi