Skip to main content

Machinery/material control with Ma-estro’s Transport Q

Italian company Ma-estro has developed the Transport Q control system for the control of material and machinery movement on large road building sites and in quarries. It says that on building sites characterised by highly dynamic situations, the main problem has been that of tracing the movements of equipment and materials entering and leaving the site, and doing this automatically, safely and accurately. “A control system entrusted to a number of persons in continuous rotation, where external personnel pay
February 26, 2013 Read time: 2 mins
Ma-estro’s Transport Q control system controls material and machinery movements on large road building sites and in quarries
Italian company 3938 Ma-Estro has developed the Transport Q control system for the control of material and machinery movement on large road building sites and in quarries.

It says that on building sites characterised by highly dynamic situations, the main problem has been that of tracing the movements of equipment and materials entering and leaving the site, and doing this automatically, safely and accurately.

“A control system entrusted to a number of persons in continuous rotation, where external personnel pays little attention to procedures and where management is spread over a number of distant sites, considerably complicates the speedy recovery and registration of accurate information on materials bought and sold, as well as the corresponding accounting,” says Ma-estro.

“Constant monitoring, with the ability to visualise anywhere and at any time both stocks and inventory documentation, simplifies building site organisation by removing the unwelcome risk of creating emergency situations or excess production.”

After careful analysis of these and other aspects, Ma-estro proposed the Transport Q control system, which can recognise vehicles automatically, allowing management and tracing of materials entering and leaving building sites, and determining the exact quantities loaded and unloaded and the real empty weight of the vehicles. It also informs the operator as to the loading/unloading site and the type of material.

In some cases, special video cameras have been supplied allowing automatic recognition of vehicles in transit and, thanks to integration with building site weighbridges, the system can also acquire information including vehicle registration number and owner data; date and time of entry and exit; empty and loaded weights of the vehicle; photographs of the material loaded/unloaded and of the vehicle; destination and final customer data; destination distance for the material, and type of material.

“Thanks to the information acquired autonomously by the system, the shipping document can be printed automatically, avoiding any personnel errors and also accelerating accounting operations when invoicing.”

Stand: C2.102

%$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal www.Ma-estro.com www.Ma-estro.com false http://www.ma-estro.com/ false false%>

%$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 11560 0 oLinkInternal <span class="oLinkInternal"><span class="oLinkInternal">View more videos</span></span> Video false /event-news/bauma-2013/video/ true false%>

For more information on companies in this article

Related Content

  • Cimolai Technology’s customised lifting quality
    January 6, 2017
    Cimolai Technology’s special lifting equipment includes mobile straddle transporters and flat-bed trolleys on tyres, rail gantry cranes, cantilever lifting devices and launching gantries for bridge and viaducts construction. The company is renowned for customised solutions and guarantees worldwide assembly and after-sale service.
  • Cimolai Technology’s customised lifting quality
    March 27, 2013
    Cimolai Technology’s special lifting equipment includes mobile straddle transporters and flat-bed trolleys on tyres, rail gantry cranes, cantilever lifting devices and launching gantries for bridge and viaducts construction. The company is renowned for customised solutions and guarantees worldwide assembly and after-sale service.
  • VIDEO footage shows bridge replacement project in Rhode Island
    October 10, 2014
    A time-lapse video has been released showing the rapid replacement of the Barton Corner Bridge in Rhode Island in the US. Rhode Island Department of Transportation (RIDOT) partnered with EarthCam to document the US$6.4 million rapid replacement of the Barton Corner Bridge. The construction project was completed during an 11-day period in August 2014 and can be seen in an exclusive time-lapse, released by RIDOT. Had RIDOT had used conventional methods, the bridge replacement would have taken two full constru
  • Wassara offers water drilling option
    January 6, 2017
    Innovative water-powered drilling technology developed in Sweden is claimed to drill straighter and deeper than conventional systems. Said to be environmentally friendly, the Wassara drilling technology has been developed and perfected over 20 years by Swedish iron ore producer LKAB. Using the Wassara drills has allowed LKAB to drastically cut operating costs. A complete range is now offered and suits applications within ground engineering, dam rehabilitation and exploration drilling. The heart in the syste