Skip to main content

Long life pavements trials

Seven countries have confirmed their participation in field trials for the proposed third phase of the Long Life Pavement Project, being operated under the auspices of the OECD (Organisation for Economic Development and Cooperation) and International Transport Forum (ITF).
July 6, 2012 Read time: 2 mins
Seven countries have confirmed their participation in field trials for the proposed third phase of the Long Life Pavement Project, being operated under the auspices of the OECD (Organisation for Economic Development and Cooperation) and 1102 International Transport Forum (ITF).

France, New Zealand, Denmark, Belgium, the UK, Ukraine and Spain have confirmed while the US, Israel and South Africa have expressed interest and could also participate in the trials.

The third phase requires that countries take an active role in constructing roads using epoxy asphalt and high performance cementitious materials (HPCM).

France indicated it will launch two construction sites using HPCM (a roundabout and a 100m section of urban road). In the latter case, a parallel experiment will take place to assess the de-pollution effect of Titane Dioxide.

New Zealand has already started constructing sections of road using epoxy asphalt.

The Long Life Pavements project began in 2002, and in the first phase an economic evaluation of long life wearing course was performed. It concluded that long life pavement surfacing costing around three times that of traditional wearing courses could be economically viable, assuming an expected life of 30 years and an annual average daily traffic of 80,000 or more.

It also concluded that laboratory tests should be conducted on the two candidate materials identified (epoxy asphalt and high performance cementitious material).

In Phase 2 (2005-08), the two materials were tested in laboratories where it was found that both materials performed well, and it was concluded that the materials should be implemented on large scale demonstrations to test production, laying and performance issues

The objectives of Phase 3 are to coordinate trials in order to research production, laying and quality control, as well as cost, and demonstrate the performance of such surfacing under real traffic and environmental conditions.

For more information on companies in this article

Related Content

  • Successful Eurobitume conference in Istanbul
    June 26, 2012
    The Eurasphalt & Eurobitume 2012 event in Turkey has attracted record attendance figures - Mike Woof reports A strong focus on sustainability has been the focus for the 5th Eurasphalt & Eurobitume Congress held in June 2012 at Turkey’s Istanbul Lutfi Kirdar Congress Centre. The conference had as its theme: Asphalt, the sustainable road to success and attracted the highest ever number of attendees for this four yearly event. In one of the opening presentations Turkey’s transport minister, Binali Yildirim, sp
  • Cost-effective innovative backfill recycling
    February 29, 2012
    Day Aggregates offers a novel materials recycling approach - Kristina Smith reports Here's a neat idea: take the muck from utilities trenches, treat it and reuse it, saving between 30-40% on the cost of landfill and backfill. This, in essence, is the theory behind Day Aggregates' EcoFILL 40 material. Confident of a growing market for this type of product, Day has invested over €569,000 (£500,000) in a new plant at its 3.4ha site in south London. "There is great demand for a solution to waste streams which
  • Cost-effective innovative backfill recycling
    April 12, 2012
    Day Aggregates offers a novel materials recycling approach - Kristina Smith reports Here's a neat idea: take the muck from utilities trenches, treat it and reuse it, saving between 30-40% on the cost of landfill and backfill. This, in essence, is the theory behind Day Aggregates' EcoFILL 40 material. Confident of a growing market for this type of product, Day has invested over €569,000 (£500,000) in a new plant at its 3.4ha site in south London. "There is great demand for a solution to waste streams
  • Smart road surfacing in a tunnel
    August 19, 2022
    Smart road construction techniques have been used in the widest tunnel in Switzerland. Efficient operation and logistics were required for paving a width of 11.5m in the Gubrist Tunnel and contractor Marti AG Solothurn Bauunternehmung made good use of Vögele’s WITOS Paving Plus technology to optimise its work on the project.