Skip to main content

Long life pavements trials

Seven countries have confirmed their participation in field trials for the proposed third phase of the Long Life Pavement Project, being operated under the auspices of the OECD (Organisation for Economic Development and Cooperation) and International Transport Forum (ITF).
July 6, 2012 Read time: 2 mins
Seven countries have confirmed their participation in field trials for the proposed third phase of the Long Life Pavement Project, being operated under the auspices of the OECD (Organisation for Economic Development and Cooperation) and 1102 International Transport Forum (ITF).

France, New Zealand, Denmark, Belgium, the UK, Ukraine and Spain have confirmed while the US, Israel and South Africa have expressed interest and could also participate in the trials.

The third phase requires that countries take an active role in constructing roads using epoxy asphalt and high performance cementitious materials (HPCM).

France indicated it will launch two construction sites using HPCM (a roundabout and a 100m section of urban road). In the latter case, a parallel experiment will take place to assess the de-pollution effect of Titane Dioxide.

New Zealand has already started constructing sections of road using epoxy asphalt.

The Long Life Pavements project began in 2002, and in the first phase an economic evaluation of long life wearing course was performed. It concluded that long life pavement surfacing costing around three times that of traditional wearing courses could be economically viable, assuming an expected life of 30 years and an annual average daily traffic of 80,000 or more.

It also concluded that laboratory tests should be conducted on the two candidate materials identified (epoxy asphalt and high performance cementitious material).

In Phase 2 (2005-08), the two materials were tested in laboratories where it was found that both materials performed well, and it was concluded that the materials should be implemented on large scale demonstrations to test production, laying and performance issues

The objectives of Phase 3 are to coordinate trials in order to research production, laying and quality control, as well as cost, and demonstrate the performance of such surfacing under real traffic and environmental conditions.

For more information on companies in this article

Related Content

  • Skanska and Kraton boost RAP use with called SYLVAROAD™ RP1000
    November 23, 2017
    The city of Västerås in central Sweden is known as a centre for industrial automation and information technology. Innovation abounds here and with it comes strong environmental efforts – meeting carbon reduction goals and maximising the recycling process, for example. A road construction project just outside this picturesque city highlights such innovation.
  • Highway Procurement: IRF Steps up to the plate to leverage long term value
    May 15, 2019
    Public procurement can be leveraged to deliver long-term value for money, and promote innovation and sustainability, according to a new White Paper published by the International Road Federation in consultation with key international specialists. “When procurement guidelines are not enforced with a high degree of professionalism, there is a much higher risk of sub-optimal delivery,” noted Eric Cook, co-chair of the IRF Committee on Alternative Financing & Procurement, who convened the stakeholders for a h
  • Clever approach to reducing bridge vibrations
    November 14, 2013
    Reducing vibrations on a bridge, supplying high-quality binders to emerging countries and helping small and medium players with warm mix, this month’s stories showcase some innovative bitumen technology solutions - Kristina Smith reports The Kessock Bridge in the Highlands of Scotland has become the third bridge in the UK to be resurfaced with Gussasphalt. A dense mastic asphalt containing Nynas Endura N5, a polymer modified binder, Gussasphalt has been designed to have a longer life than standard mastic as
  • Airport's high demands on asphalt and concrete techniques
    July 11, 2012
    Airport runway, taxiway and parking areas make high demands on paving requirements, both with concrete and asphalt techniques. Mike Woof reports. High quality surface finishes are required in airport environments for runways, taxiways and aircraft parking areas. Because of the speed at which aircraft take off and land and the massive forces exerted due to the weight of the aircraft, particularly during landing, runway structures need to be incredibly strong. The surfaces also have to be constructed to very