Skip to main content

Long life pavements trials

Seven countries have confirmed their participation in field trials for the proposed third phase of the Long Life Pavement Project, being operated under the auspices of the OECD (Organisation for Economic Development and Cooperation) and International Transport Forum (ITF).
July 6, 2012 Read time: 2 mins
Seven countries have confirmed their participation in field trials for the proposed third phase of the Long Life Pavement Project, being operated under the auspices of the OECD (Organisation for Economic Development and Cooperation) and 1102 International Transport Forum (ITF).

France, New Zealand, Denmark, Belgium, the UK, Ukraine and Spain have confirmed while the US, Israel and South Africa have expressed interest and could also participate in the trials.

The third phase requires that countries take an active role in constructing roads using epoxy asphalt and high performance cementitious materials (HPCM).

France indicated it will launch two construction sites using HPCM (a roundabout and a 100m section of urban road). In the latter case, a parallel experiment will take place to assess the de-pollution effect of Titane Dioxide.

New Zealand has already started constructing sections of road using epoxy asphalt.

The Long Life Pavements project began in 2002, and in the first phase an economic evaluation of long life wearing course was performed. It concluded that long life pavement surfacing costing around three times that of traditional wearing courses could be economically viable, assuming an expected life of 30 years and an annual average daily traffic of 80,000 or more.

It also concluded that laboratory tests should be conducted on the two candidate materials identified (epoxy asphalt and high performance cementitious material).

In Phase 2 (2005-08), the two materials were tested in laboratories where it was found that both materials performed well, and it was concluded that the materials should be implemented on large scale demonstrations to test production, laying and performance issues

The objectives of Phase 3 are to coordinate trials in order to research production, laying and quality control, as well as cost, and demonstrate the performance of such surfacing under real traffic and environmental conditions.

For more information on companies in this article

Related Content

  • Groundbreaking calculator of greenhouse gas emissions
    February 9, 2012
    Time for CHANGER IRF launches CHANGER, a groundbreaking calculator of greenhouse gas emissions from road construction. Our world is changing, our climate is changing.
  • Groundbreaking calculator of greenhouse gas emissions
    April 12, 2012
    IRF launches CHANGER, a groundbreaking calculator of greenhouse gas emissions from road construction. Our world is changing, our climate is changing. Industry too is changing to meet the new social, environmental and economic challenges of our times. Already, the road sector has taken a decisive lead in this respect by transforming its practices and adopting new, more eco-friendly techniques and technologies. CHANGER is the latest flagship project in this evolution: the sign of an indust
  • Recycled asphalt cuts costs, maximises performance
    February 10, 2012
    The need to maximise road performance and cut costs has resulted in Indonesian contractors being keen to adopt cold recycling methods
  • How waste plastic and soybean oil are helping our roads last longer
    April 13, 2018
    A new super-modifier is born from waste plastic in Italy and a soybean-based rejuvenator from the US spreads from its home market. By Kristina Smith The two bitumen technologies featured this month come from almost opposing sources. One emerges from the human-created plastic waste plaguing our planet, the other from a plant. However, both technologies have been created with the same aims: to increase the life of roads, saving cost and ultimately reducing the impact of road building on the planet. A coll