Skip to main content

Long life pavements trials

Seven countries have confirmed their participation in field trials for the proposed third phase of the Long Life Pavement Project, being operated under the auspices of the OECD (Organisation for Economic Development and Cooperation) and International Transport Forum (ITF).
July 6, 2012 Read time: 2 mins
Seven countries have confirmed their participation in field trials for the proposed third phase of the Long Life Pavement Project, being operated under the auspices of the OECD (Organisation for Economic Development and Cooperation) and 1102 International Transport Forum (ITF).

France, New Zealand, Denmark, Belgium, the UK, Ukraine and Spain have confirmed while the US, Israel and South Africa have expressed interest and could also participate in the trials.

The third phase requires that countries take an active role in constructing roads using epoxy asphalt and high performance cementitious materials (HPCM).

France indicated it will launch two construction sites using HPCM (a roundabout and a 100m section of urban road). In the latter case, a parallel experiment will take place to assess the de-pollution effect of Titane Dioxide.

New Zealand has already started constructing sections of road using epoxy asphalt.

The Long Life Pavements project began in 2002, and in the first phase an economic evaluation of long life wearing course was performed. It concluded that long life pavement surfacing costing around three times that of traditional wearing courses could be economically viable, assuming an expected life of 30 years and an annual average daily traffic of 80,000 or more.

It also concluded that laboratory tests should be conducted on the two candidate materials identified (epoxy asphalt and high performance cementitious material).

In Phase 2 (2005-08), the two materials were tested in laboratories where it was found that both materials performed well, and it was concluded that the materials should be implemented on large scale demonstrations to test production, laying and performance issues

The objectives of Phase 3 are to coordinate trials in order to research production, laying and quality control, as well as cost, and demonstrate the performance of such surfacing under real traffic and environmental conditions.

For more information on companies in this article

Related Content

  • Australia promotes sustainable transport initiatives
    July 13, 2012
    Roads Australia is encouraging its members to get behind TravelSmart, the government-led campaign to promote sustainable transport alternatives and reduce our reliance on private cars. A number of TravelSmart initiatives and programmes were highlighted at a recent meeting of RA's Congestion Chapter. It was stressed at the meeting that Roads Australia members could set an example for the community by getting its organisations more involved in the programme.
  • Indian quarry boosts wear life and output
    June 20, 2016
    An Indian quarry facility has seen increased uptime and gains in overall efficiency due to the installation of new wear components in its crushing system Installing new distributor plates in this Indian granite quarry has increased its plate operational lifetime by 400-500%. Panchami Stone has fitted the unique HX900 plates to the 85 HP rotor of its Sandvik Construction CV218 VSI, reducing its replacement costs by 50%. The Panchami Stone granite quarry is located 60km from Bangalore, in the south of I
  • Ukraine's pivotal plans
    February 16, 2012
    The authorities in the Ukraine are in discussions regarding financing for a major road project, as well as making plans for the country's first ever highway concession.
  • Machine Control sector is the place for acquisitions
    January 22, 2014
    The machine control sector has been lively in recent months with a major acquisition, the unveiling of new software innovation and landmark testing of new technology to monitor paving temperature. Guy Woodford reports The state road construction authority in the German state of Saxony-Anhalt (LSBB Saxony-Anhalt) has become the first nationally to test MOBA’s new PAVE-IR Scan temperature measurement system at a works site.