Skip to main content

Loadrite introduces its 360° load-out management system

The new Loadrite 360° management system has been designed to boost efficiency in quarries by integrating communication across all stages of an order for faster turnarounds and maximised payloads. Loadrite said that the system improves communication throughout the load-out operations. It is aimed at providing quarry managers with the tools they need to get the most from both staff and equipment. Benefits include lower costs per tonne and optimised truck utilisation, said the company.
January 6, 2017 Read time: 1 min
The new 5004 Loadrite 360° management system has been designed to boost efficiency in quarries by integrating communication across all stages of an order for faster turnarounds and maximised payloads.

Loadrite said that the system improves communication throughout the load-out operations. It is aimed at providing quarry managers with the tools they need to get the most from both staff and equipment. Benefits include lower costs per tonne and optimised truck utilisation, said the company.

Loadrite 360° integrates with the existing ticketing system and there is an automated communication link between the weighbridge and the loaders. It handles every step, right from the customer placing the order and it being entered into the system. The system also provides real-time visibility of traffic on the site and feedback on the accuracy of loads. It can also be used to study historical analysis and produce reporting of key performance indicators.

Stand: C2.121

%$Linker: 2 Asset <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 12839 0 oLinkExternal www.LoadriteScales.com www.LoadriteScales.com false /EasySiteWeb/GatewayLink.aspx?alId=12839 false false%>

For more information on companies in this article

Related Content

  • Bridge building in miniature by Cimolai
    April 19, 2013
    Bespoke equipment supplier Cimolai Technology is exhibiting a model of the equipment it supplied for a Bulgarian bridge project. Construction of the bridge entailed lifting and positioning pre-cast sections weighing up to 260tonnes. Cimolai designed, built and supplied a bespoke cantilever lifting system to sit atop the centre pillar and simultaneously hoist the blocks from barges 42m below on the river Danube. The company said its European contracting customers are increasingly winning orders further afiel
  • TESMEC Group’s multi-purpose solutions
    April 9, 2013
    The design and production of high powered tracked trenchers for linear excavation and bulk excavation and surface mining is one of many areas of expertise associated with the TESMEC Group. TESMEC also designs and manufactures machines and integrated systems for the stringing and maintenance of power lines; integrated solutions for the efficiency, the management and the monitoring of power grids; machines for the stringing, maintenance and diagnostic of railway power lines; and the design and production of G
  • Verco buckets up to extreme condition mining
    January 6, 2017
    Verco has been supplying buckets for mining in extreme conditions for more than 25 years. Proud members of the HARDOX WEARPARTS network, and with products boasting the logo HARDOX IN MY BODY, Verco specialises in the production of bucket for big excavators and wheeled loaders. The firm also produces wear parts, liners for crushers and recycling equipment.
  • Verco buckets up to extreme condition mining
    April 9, 2013
    Verco has been supplying buckets for mining in extreme conditions for more than 25 years. Proud members of the HARDOX WEARPARTS network, and with products boasting the logo HARDOX IN MY BODY, Verco specialises in the production of bucket for big excavators and wheeled loaders. The firm also produces wear parts, liners for crushers and recycling equipment.