Skip to main content

Load bearing tower wins European safety award

Highly integrated safety engineered into the Staxo 100 load-bearing tower has won Doka the European award for safety in structural engineering in Spain.
February 21, 2012 Read time: 1 min
Doka Espana recieved the award for its Staxo 100 load-bearing tower
Highly integrated safety engineered into the Staxo 100 load-bearing tower has won 203 Doka the European award for safety in structural engineering in Spain.

Doka España accepted the award from Spain’s General Council of Technical Architecture (Consejo General de la Arquitectura Técnica de España, 2943 CGATE) in recognition of developments in effectively preventing accidents on site. The Staxo 100 load-bearing towers won the award in the Innovation and Research category.

Javier Lorenzo, Doka España, said: “Doka develops systems that not only reduce but also effectively prevent accidents on site. The Staxo 100 and Staxo 40 load-bearing tower systems from Doka combine easy handling and high load-bearing strength with maximum safety.”

For more information on companies in this article

Related Content

  • Innovation award entries for bauma 2022
    January 25, 2022
    Innovation award entries are being sought for the bauma 2022 exhibition.
  • Aggregate Industries lightens the load for the Acton Swing Bridge
    October 2, 2018
    Aggregates Industries recently lightened the load for the 73m-long bow string truss Acton Swing Bridge in England. When opened in 1933, it was the first floating swing bridge in the UK – floating on a pontoon. The 84-year-old bridge, which is cared for by the Canal & River Trust charity, carries the busy A49 road over the River Weaver Navigation, in the county of Cheshire. A recent €1.7 million complete refurbishment included strengthening works to the underside of the bridge as well as improvements to its
  • Doka showcases Cut&Cover tunnel construction solution
    January 6, 2017
    Austrian firm Doka will be showcasing at bauma its first system to be specifically designed and optimised for cut-and-cover tunnel construction. With Doka CC (Cut and Cover), different types of traffic tunnel, such as rail or road tunnels, are said to be able to be built quickly, efficiently and safely. Doka says the creation of its innovative tunnel system was made possible only by the use of hi-tech construction materials and products such as the Composite formwork beam I tec 20. The choice of high-grade
  • Doka showcases Cut&Cover tunnel construction solution
    February 7, 2013
    Austrian firm Doka will be showcasing at bauma its first system to be specifically designed and optimised for cut-and-cover tunnel construction. With Doka CC (Cut and Cover), different types of traffic tunnel, such as rail or road tunnels, are said to be able to be built quickly, efficiently and safely. Doka says the creation of its innovative tunnel system was made possible only by the use of hi-tech construction materials and products such as the Composite formwork beam I tec 20. The choice of high-grade