Skip to main content

Load bearing tower wins European safety award

Highly integrated safety engineered into the Staxo 100 load-bearing tower has won Doka the European award for safety in structural engineering in Spain.
February 21, 2012 Read time: 1 min
Doka Espana recieved the award for its Staxo 100 load-bearing tower
Highly integrated safety engineered into the Staxo 100 load-bearing tower has won 203 Doka the European award for safety in structural engineering in Spain.

Doka España accepted the award from Spain’s General Council of Technical Architecture (Consejo General de la Arquitectura Técnica de España, 2943 CGATE) in recognition of developments in effectively preventing accidents on site. The Staxo 100 load-bearing towers won the award in the Innovation and Research category.

Javier Lorenzo, Doka España, said: “Doka develops systems that not only reduce but also effectively prevent accidents on site. The Staxo 100 and Staxo 40 load-bearing tower systems from Doka combine easy handling and high load-bearing strength with maximum safety.”

For more information on companies in this article

Related Content

  • Tunnel inspections reveal safety compliance need
    May 9, 2012
    Results show the state of Europe's tunnel infrastructure at its 'most sublime and most depressing quality' as Patrick Smith reports. EuroTAP [European Tunnel Assessment Programme] 2010 has unveiled the results of inspections conducted earlier this year in 26 major tunnels in 13 European countries. The on site inspections, carried out between 12 April and 20 May, 2010, are said to indicate that an "alarming number of operational tunnels across Europe will not be ready to comply with EU tunnel safety rules wh
  • Doka rises to the challenge on Turkey’s Eyiste Viaduct
    June 4, 2019
    Formwork specialist Doka recently rose to the challenge on Turkey’s Eyiste Viadust, the country’s highest bridge with piers up to 155m tall. The Eyiste Viaduct will be part of a route between Central Anatolia and Turkey’s Mediterranean region, shortening travel time between the cities of Konya and Alanya. Cantilever forming travellers and Doka’s automatic climbing formwork Xclimb 60 were part of the construction solution. The viaduct is nearly 1.4km long and carried by two abutments and eight piers, stret
  • Doka puts the ‘Y’ in Turkey
    July 8, 2020
    The 600m cable-stayed Kömürhan Bridge rises around 165m over eastern Turkey’s Karakaya Dam Lake and is part of the Malatya-Elazig State Highway. The bridge is the fourth single-pylon cable-stayed bridge in the world and is due to open in July.
  • Six bauma Innovation Award 2013 winners revealed
    January 6, 2017
    The six bauma Innovation Award 2013 winners have been revealed. Pipe Express, from Herrenknecht, triumphed in the Machinery category, while AutoPilot Field Rover, from Wirtgen, took the Machine Components section. The Construction process/Construction work category had two winners.