Skip to main content

Load bearing tower wins European safety award

Highly integrated safety engineered into the Staxo 100 load-bearing tower has won Doka the European award for safety in structural engineering in Spain.
February 21, 2012 Read time: 1 min
Doka Espana recieved the award for its Staxo 100 load-bearing tower
Highly integrated safety engineered into the Staxo 100 load-bearing tower has won 203 Doka the European award for safety in structural engineering in Spain.

Doka España accepted the award from Spain’s General Council of Technical Architecture (Consejo General de la Arquitectura Técnica de España, 2943 CGATE) in recognition of developments in effectively preventing accidents on site. The Staxo 100 load-bearing towers won the award in the Innovation and Research category.

Javier Lorenzo, Doka España, said: “Doka develops systems that not only reduce but also effectively prevent accidents on site. The Staxo 100 and Staxo 40 load-bearing tower systems from Doka combine easy handling and high load-bearing strength with maximum safety.”

For more information on companies in this article

Related Content

  • New bridge refurbishment solutions now available
    July 15, 2015
    An array of new bridge refurbishment and repair solutions are available – Mike Woof writes Around the world there are many bridges requiring repairs or refurbishment, and there is a ready market for novel solutions to upgrade existing structures. New developments offer quicker and more efficient ways to improve bridge surfaces and structural performance and add new life to ageing designs. Spancrete is broadening the availability of its novel precast building solutions worldwide by offering these to th
  • Aggregates production innovations delivering efficiency
    August 1, 2017
    EvoQuip, the newest division of Terex Corporation, is launching a Cobra 230 impact crusher later this year, to sit alongside the Cobra 260. The 24tonne machine will offer a production capacity of 140-150tonnes/hour in asphalt and construction recycling. The Cobra 230 is 11.3m long and 2.46m wide, or 5.15m wide with a side conveyor. It features a quick set-up time and the machine can be moved onsite without having to stop the crusher. Keestrack says that its novel H4 tracked cone crusher is light and compact
  • 'Soft' option gets results
    February 8, 2012
    Soft engineering techniques, used to prevent soil erosion and stabilise steep cuts and embankments, have allowed engineers to successfully widen the M1 motorway in the UK. Over the 50km length of the work (25km northbound, 25km southbound) on a busy section of the motorway near the city of Nottingham, a total of 48km of slopes had to be modified, split roughly between cutting and embankment. The UK Highways Agency requirements for the work meant that wholesale widening of the corridor was not possible: the
  • TWI, Coventry combine fatigue research
    July 20, 2020
    Bridge stress among issues for the Fatigue and Structural Integrity Innovation Centre.