Skip to main content

Lintec’s new Aggregate Cooling System given bauma platform

Lintec’s Aggregate Cooling System (ACS) is described as a new, patented and fully containerised plant concept for the direct cooling of aggregates for concrete mixes. Being showcased at bauma, ACS is said by Lintec to work in a desert environment without the usual and costly addition of specifically produced ice.
January 6, 2017 Read time: 1 min
Plant layout featuring ACS. 1. Aggregate Feeder 2 .Inclined conveyor 3. Fine sand cooler 4. Rough sand cooler 5. Air cooling system 6. Chiller 7. Cold water tank 8. Conveyor belt
1177 Lintec’s Aggregate Cooling System (ACS) is described as a new, patented and fully containerised plant concept for the direct cooling of aggregates for concrete mixes. Being showcased at bauma, ACS is said by Lintec to work in a desert environment without the usual and costly addition of specifically produced ice.

The patented ACS process uses pre-cooled water and a fan system to cool the fine sand as well as the bigger aggregates. The ACS system, available with new plants and through retrofitting on existing ones, is said to ensure cost savings of more than 50% compared to the use of the ice cooling system.

Stand: F12 1211/1

%$Linker: 2 Asset <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 44422 0 oLinkExternal www.lintec-gmbh.de www.lintec-gmbh.de false /EasySiteWeb/GatewayLink.aspx?alId=44422 false false%>

Related Content

  • Lintec presents new Gussasphalt plant for the European Market
    April 12, 2012
    German company Lintec will present for the first time its specially designed and fully containerised Gussasphalt plant for the European Market, the CDD 1200 GA. The plant has a capacity of 20tonnes of Gussasphalt per hour (optional up to 20tonnes/hour), and was sold to the French company SMAC (belonging to the Colas Group) and will operate in the west of France near Rennes. The plant has a hot bin with one chamber and can take 15tonnes of material while the recuperated filler silo is 11tonnes and one or tw
  • Lintec expands manufacturing capacity to meet market demand
    January 6, 2017
    German asphalt and concrete plant constructor Lintec is rapidly expanding its manufacturing base around the world to meet growing demand for its modular material production equipment from both well established and emerging markets. The company’s new facility in Poland has recently supplied its first CDD 1200 GA Gussasphalt plant to French company SMAC, part of the Colas Group. However, the company is also enjoying strong demand from facilities in Brazil, Shanghai and Singapore.
  • Lintec expands manufacturing capacity to meet market demand
    April 20, 2012
    German asphalt and concrete plant constructor Lintec is rapidly expanding its manufacturing base around the world to meet growing demand for its modular material production equipment from both well established and emerging markets. The company’s new facility in Poland has recently supplied its first CDD 1200 GA Gussasphalt plant to French company SMAC, part of the Colas Group. However, the company is also enjoying strong demand from facilities in Brazil, Shanghai and Singapore.
  • Lintec’s first Aggregates Cooling System sold to Dubai
    January 6, 2017
    A new, patented Aggregates Cooling System (ACS) was one of the main taking points on the stand of asphalt and concrete plant manufacturer Lintec at Conexpo. Lintec has just sold its first ever plant to concrete manufacturer Emirates Beton in Dubai. When mixing concrete in warm climates, aggregate has to be cooled in order to maintain the performance and quality of the finished product, explained Lintec managing director Carsten Weiss: “If you don’t cool it, you don’t get the strength at the end,” he said. “