Skip to main content

Lintec showcases redesigned CSD 1500 plant at bauma

Especially redesigned to allow hot and cold recycling, Lintec will be showcasing its new CSD 1500 asphalt mixing plant at bauma. With a capacity of 120 tonnes/hour, the new CSD 1500 enables the integration of a hot storage silo with a 50tonne capacity. Similar to all Lintec’s CSD line plants, the aggregates enter the screen drum through the front wall.
February 12, 2013 Read time: 1 min
The new CSD 1500 asphalt mixing plant from Lintec has a 120tonnes/hour capacity
Especially redesigned to allow hot and cold recycling, 1177 Lintec will be showcasing its new CSD 1500 asphalt mixing plant at bauma.

With a capacity of 120 tonnes/hour, the new CSD 1500 enables the integration of a hot storage silo with a 50tonne capacity. Similar to all Lintec’s CSD line plants, the aggregates enter the screen drum through the front wall.

Producing a 1.5tonne sized batch, the hot storage silo comprises two 25tonne chambers. The plant’s horizontal skip bucket is 2tonnes with emergency discharge of 3.5tonnes. Bitumen tanks with the plant can either be containerised (vertical) or conventional (horizontal), with an agitator for (Polymer Modified Bitumen) PMB available for both.

The plant can be heated electrically or with thermal oil, with a further option being the addition of cellulose or additives.

Stand: F12 1211/1

%$Linker: 2 Asset <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 44422 0 oLinkExternal www.lintec-gmbh.de www.lintec-gmbh.de false /EasySiteWeb/GatewayLink.aspx?alId=44422 false false%>

 

%$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 11560 0 oLinkInternal <span class="oLinkInternal"><span class="oLinkInternal">View more videos</span></span> Video false /event-news/bauma-2013/video/ true false%>

Related Content

  • Accurate load weighing system from Loadrite
    February 13, 2013
    The Loadrite L2150 wheeled loader bucket weighing system is said to offer increased accuracy and reliability. The system is said to ensure haul trucks can be loaded properly, improving overall productivity by ensuring operational efficiency. Using this weighing system trucks are neither under-loaded nor over-loaded, with the ensuing associated productivity losses and excess machine wear problems respectively, all but eliminated. Aimed at use in large quarry operations the new Loadrite L2150 unit is said to
  • CTE develops new high reach access platform
    January 6, 2017
    A new platform line has been launched by CTE, the B-Lift 390 High Range, a truck-mounted high range telescopic platform which is able to meet the requirements of various markets. The platform reaches 39 m of working height with 26.3m of maximum outreach and 450kg of maximum loading capacity. It has a telescopic boom (4 elements) with main boom and 3 telescopic extensions and H stabilisation system.
  • CTE develops new high reach access platform
    February 15, 2013
    A new platform line has been launched by CTE, the B-Lift 390 High Range, a truck-mounted high range telescopic platform which is able to meet the requirements of various markets. The platform reaches 39 m of working height with 26.3m of maximum outreach and 450kg of maximum loading capacity. It has a telescopic boom (4 elements) with main boom and 3 telescopic extensions and H stabilisation system.
  • Yanmar will show complete line of Tier 4 Final engines, along with an electronic diagnostic system
    January 6, 2017
    Engine supplier Yanmar will show a full range of California Air Resources Board (CARB) certified engines at Bauma. The company claims to be the first engine manufacturer to achieve the CARB accreditation across its complete line-up in the 19-56kW (25-75hp) range, and the engines all meet the US Tier 4 Final standard too. The firm will also announce an electronic diagnostic service system called Smart Assist-Direct. The system allows rapid updates of engine software and can automatically retrieve technical s