Skip to main content

Lintec showcases redesigned CSD 1500 plant at bauma

Especially redesigned to allow hot and cold recycling, Lintec will be showcasing its new CSD 1500 asphalt mixing plant at bauma. With a capacity of 120 tonnes/hour, the new CSD 1500 enables the integration of a hot storage silo with a 50tonne capacity. Similar to all Lintec’s CSD line plants, the aggregates enter the screen drum through the front wall.
February 12, 2013 Read time: 1 min
The new CSD 1500 asphalt mixing plant from Lintec has a 120tonnes/hour capacity
Especially redesigned to allow hot and cold recycling, 1177 Lintec will be showcasing its new CSD 1500 asphalt mixing plant at bauma.

With a capacity of 120 tonnes/hour, the new CSD 1500 enables the integration of a hot storage silo with a 50tonne capacity. Similar to all Lintec’s CSD line plants, the aggregates enter the screen drum through the front wall.

Producing a 1.5tonne sized batch, the hot storage silo comprises two 25tonne chambers. The plant’s horizontal skip bucket is 2tonnes with emergency discharge of 3.5tonnes. Bitumen tanks with the plant can either be containerised (vertical) or conventional (horizontal), with an agitator for (Polymer Modified Bitumen) PMB available for both.

The plant can be heated electrically or with thermal oil, with a further option being the addition of cellulose or additives.

Stand: F12 1211/1

%$Linker: 2 Asset <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 44422 0 oLinkExternal www.lintec-gmbh.de www.lintec-gmbh.de false /EasySiteWeb/GatewayLink.aspx?alId=44422 false false%>

 

%$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 11560 0 oLinkInternal <span class="oLinkInternal"><span class="oLinkInternal">View more videos</span></span> Video false /event-news/bauma-2013/video/ true false%>

Related Content

  • JLG launches new telehandler
    January 6, 2017
    JLG International has launched a new telehandler, the 250S. “We updated the machine in order to comply with the new emissions regulations,” said JLG marketing communications manager Xenia Kolijn. The telehandler has a Deutz engine and complies with Tier 4 final, said Kolijn.
  • JLG launches new telehandler
    April 19, 2013
    JLG International has launched a new telehandler, the 250S. “We updated the machine in order to comply with the new emissions regulations,” said JLG marketing communications manager Xenia Kolijn. The telehandler has a Deutz engine and complies with Tier 4 final, said Kolijn.
  • New technical centre boosts CMS Cepcor
    January 6, 2017
    Crusher spares specialist CMS Cepcor has opened a new technical centre at Coalville in the UK and has now transferred its Baguley Precision Engineering business into the newly formed Precision Services Division. The company has moved machine servicing from Burton-on-Trent to the new technical centre and retained all the engineering staff. Within the centre is a CNC manufacturing capability, which will enhance the manufacturing, inspection and repair facilities at Coalville.
  • New technical centre boosts CMS Cepcor
    April 18, 2013
    Crusher spares specialist CMS Cepcor has opened a new technical centre at Coalville in the UK and has now transferred its Baguley Precision Engineering business into the newly formed Precision Services Division. The company has moved machine servicing from Burton-on-Trent to the new technical centre and retained all the engineering staff. Within the centre is a CNC manufacturing capability, which will enhance the manufacturing, inspection and repair facilities at Coalville.