Skip to main content

Lintec showcases redesigned CSD 1500 plant at bauma

Especially redesigned to allow hot and cold recycling, Lintec will be showcasing its new CSD 1500 asphalt mixing plant at bauma. With a capacity of 120 tonnes/hour, the new CSD 1500 enables the integration of a hot storage silo with a 50tonne capacity. Similar to all Lintec’s CSD line plants, the aggregates enter the screen drum through the front wall.
February 12, 2013 Read time: 1 min
The new CSD 1500 asphalt mixing plant from Lintec has a 120tonnes/hour capacity
Especially redesigned to allow hot and cold recycling, 1177 Lintec will be showcasing its new CSD 1500 asphalt mixing plant at bauma.

With a capacity of 120 tonnes/hour, the new CSD 1500 enables the integration of a hot storage silo with a 50tonne capacity. Similar to all Lintec’s CSD line plants, the aggregates enter the screen drum through the front wall.

Producing a 1.5tonne sized batch, the hot storage silo comprises two 25tonne chambers. The plant’s horizontal skip bucket is 2tonnes with emergency discharge of 3.5tonnes. Bitumen tanks with the plant can either be containerised (vertical) or conventional (horizontal), with an agitator for (Polymer Modified Bitumen) PMB available for both.

The plant can be heated electrically or with thermal oil, with a further option being the addition of cellulose or additives.

Stand: F12 1211/1

%$Linker: 2 Asset <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 44422 0 oLinkExternal www.lintec-gmbh.de www.lintec-gmbh.de false /EasySiteWeb/GatewayLink.aspx?alId=44422 false false%>

 

%$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 11560 0 oLinkInternal <span class="oLinkInternal"><span class="oLinkInternal">View more videos</span></span> Video false /event-news/bauma-2013/video/ true false%>

Related Content

  • Sennebogen premieres 70tonne telescopic crane
    April 19, 2013
    Sennebogen has plugged the gap in its telescopic crawler crane range with the introduction of the 673R-HD. The 70tonne capacity machine sits between the firm’s 40 and 80tonne models, offering a 36m four-stage main boom with two fly booms of 8m and 15m. This gives a maximum reach of 51m. The 673R-HD is powered by a Stage IIIB/Tier 4 Interim standard Deutz engine delivering 160kW. Telescopic track frames allow for a maximum transport width of just 3m, with fast set-up on site as they extend out to provide sta
  • Getech spins centrifugal washwater cleaner into tunnelling applications
    January 6, 2017
    Getech, the Italian manufacturer of centrifugal washwater cleaning systems (formerly Gennaretti) is targeting tunnelling operations with containerised versions of its V type machines. The five-machine range can remove up to 60tonnes an hour of solids from washwater flows of up to 180m3/hr.
  • Getech spins centrifugal washwater cleaner into tunnelling applications
    April 17, 2013
    Getech, the Italian manufacturer of centrifugal washwater cleaning systems (formerly Gennaretti) is targeting tunnelling operations with containerised versions of its V type machines. The five-machine range can remove up to 60tonnes an hour of solids from washwater flows of up to 180m3/hr.
  • ZF looks to combine hybrid module with cPower CVT transmission
    January 6, 2017
    ZF used bauma 2013 to show the next stage of development for its cPower continuously variable transmission (CVT). By combining the transmission with a hybrid module, ZF said greater operating efficiencies were available from the integration of start/stop technology and energy recovery from regenerative braking. Potentially, the hybrid drive system has the ability to boost fuel efficiency by up to 25% in addition to the 20% higher operating efficiency already offered by the cPower transmission, said ZF.