Skip to main content

Lintec showcases redesigned CSD 1500 plant at bauma

Especially redesigned to allow hot and cold recycling, Lintec will be showcasing its new CSD 1500 asphalt mixing plant at bauma. With a capacity of 120 tonnes/hour, the new CSD 1500 enables the integration of a hot storage silo with a 50tonne capacity. Similar to all Lintec’s CSD line plants, the aggregates enter the screen drum through the front wall.
February 12, 2013 Read time: 1 min
The new CSD 1500 asphalt mixing plant from Lintec has a 120tonnes/hour capacity
Especially redesigned to allow hot and cold recycling, 1177 Lintec will be showcasing its new CSD 1500 asphalt mixing plant at bauma.

With a capacity of 120 tonnes/hour, the new CSD 1500 enables the integration of a hot storage silo with a 50tonne capacity. Similar to all Lintec’s CSD line plants, the aggregates enter the screen drum through the front wall.

Producing a 1.5tonne sized batch, the hot storage silo comprises two 25tonne chambers. The plant’s horizontal skip bucket is 2tonnes with emergency discharge of 3.5tonnes. Bitumen tanks with the plant can either be containerised (vertical) or conventional (horizontal), with an agitator for (Polymer Modified Bitumen) PMB available for both.

The plant can be heated electrically or with thermal oil, with a further option being the addition of cellulose or additives.

Stand: F12 1211/1

%$Linker: 2 Asset <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 44422 0 oLinkExternal www.lintec-gmbh.de www.lintec-gmbh.de false /EasySiteWeb/GatewayLink.aspx?alId=44422 false false%>

 

%$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 11560 0 oLinkInternal <span class="oLinkInternal"><span class="oLinkInternal">View more videos</span></span> Video false /event-news/bauma-2013/video/ true false%>

Related Content

  • REV’S a gold mine for mining and quarrying equipment
    April 8, 2013
    REV has spent more than 45 years of experience designing and producing crushing and screening mobile units and complete plants for mining industry, aggregate processing, quarrying applications, recycling and recovery of in-pit material. The firm offers a wide range of custom-made products suitable for the most demanding jobs. At bauma 2013, REV will present its latest products which, the company says, combines its experience and tradition with innovation.
  • REMU launches Combi E8 screening plant
    April 16, 2013
    Finnish company Remu has launched its new screening plant, the Remu Combi E8. A non-clogging screening plant for preparing topsoil and processing various waste materials, the re-engineered solutions have increased screening capacity by a wider 950mm screening table and a new 2.6m3 feeder unit.
  • Waitzinger concrete pumps shown in Liebherr colours for the first time
    January 6, 2017
    Bauma 2013 will see the former Waitzinger concrete pump range in Liebherr livery for the first time, following the purchase of the company in October 2012. Liebherr will show four pumps, including the compact 41 M5XXT and the high capacity THP 160H/36 R4XXH. This truck-mounted pump has a four-section 36m boom yet sits on the narrow XXH outrigger supports and is capable of handling up to 160m3/h of concrete delivery.
  • Waitzinger concrete pumps shown in Liebherr colours for the first time
    February 7, 2013
    Bauma 2013 will see the former Waitzinger concrete pump range in Liebherr livery for the first time, following the purchase of the company in October 2012. Liebherr will show four pumps, including the compact 41 M5XXT and the high capacity THP 160H/36 R4XXH. This truck-mounted pump has a four-section 36m boom yet sits on the narrow XXH outrigger supports and is capable of handling up to 160m3/h of concrete delivery.