Skip to main content

Lintec showcases redesigned CSD 1500 plant at bauma

Especially redesigned to allow hot and cold recycling, Lintec will be showcasing its new CSD 1500 asphalt mixing plant at bauma. With a capacity of 120 tonnes/hour, the new CSD 1500 enables the integration of a hot storage silo with a 50tonne capacity. Similar to all Lintec’s CSD line plants, the aggregates enter the screen drum through the front wall.
January 6, 2017 Read time: 1 min
The new CSD 1500 asphalt mixing plant from Lintec has a 120tonnes/hour capacity
Especially redesigned to allow hot and cold recycling, 1177 Lintec will be showcasing its new CSD 1500 asphalt mixing plant at bauma.

With a capacity of 120 tonnes/hour, the new CSD 1500 enables the integration of a hot storage silo with a 50tonne capacity. Similar to all Lintec’s CSD line plants, the aggregates enter the screen drum through the front wall.

Producing a 1.5tonne sized batch, the hot storage silo comprises two 25tonne chambers. The plant’s horizontal skip bucket is 2tonnes with emergency discharge of 3.5tonnes. Bitumen tanks with the plant can either be containerised (vertical) or conventional (horizontal), with an agitator for (Polymer Modified Bitumen) PMB available for both.

The plant can be heated electrically or with thermal oil, with a further option being the addition of cellulose or additives.

Stand: F12 1211/1

%$Linker: 2 Asset <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 44422 0 oLinkExternal www.lintec-gmbh.de www.lintec-gmbh.de false /EasySiteWeb/GatewayLink.aspx?alId=44422 false false%>

Related Content

  • Lintec’s new Aggregate Cooling System given bauma platform
    February 12, 2013
    Lintec’s Aggregate Cooling System (ACS) is described as a new, patented and fully containerised plant concept for the direct cooling of aggregates for concrete mixes. Being showcased at bauma, ACS is said by Lintec to work in a desert environment without the usual and costly addition of specifically produced ice.
  • Lintec presents new Gussasphalt plant for the European Market
    January 6, 2017
    German company Lintec will present for the first time its specially designed and fully containerised Gussasphalt plant for the European Market, the CDD 1200 GA. The plant has a capacity of 20tonnes of Gussasphalt per hour (optional up to 20tonnes/hour), and was sold to the French company SMAC (belonging to the Colas Group) and will operate in the west of France near Rennes. The plant has a hot bin with one chamber and can take 15tonnes of material while the recuperated filler silo is 11tonnes and one or tw
  • Lintec presents new Gussasphalt plant for the European Market
    April 12, 2012
    German company Lintec will present for the first time its specially designed and fully containerised Gussasphalt plant for the European Market, the CDD 1200 GA. The plant has a capacity of 20tonnes of Gussasphalt per hour (optional up to 20tonnes/hour), and was sold to the French company SMAC (belonging to the Colas Group) and will operate in the west of France near Rennes. The plant has a hot bin with one chamber and can take 15tonnes of material while the recuperated filler silo is 11tonnes and one or tw
  • New releases from Lintec continues emphasis on energy-saving and recycling
    January 6, 2017
    Lintec has launched new asphalt and concrete mixing plants at bauma 2013. This rounds up the company’s product range and continues to put special emphasis on the subjects of energy saving and the recycling of asphalt pavement (RAP).