Skip to main content

Lintec presents new Gussasphalt plant for the European Market

German company Lintec will present for the first time its specially designed and fully containerised Gussasphalt plant for the European Market, the CDD 1200 GA. The plant has a capacity of 20tonnes of Gussasphalt per hour (optional up to 20tonnes/hour), and was sold to the French company SMAC (belonging to the Colas Group) and will operate in the west of France near Rennes. The plant has a hot bin with one chamber and can take 15tonnes of material while the recuperated filler silo is 11tonnes and one or tw
April 12, 2012 Read time: 2 mins
Lintec’s new Gussasphalt plant, developed for the European market
%$Linker: 2 Internal 2 4802 0 oLinkInternal <span class="oLinkInternal"><span class="oLinkInternal">RSS</span></span> Road Paving and Recycling false /event-news/intermat-2012/rss/road-paving-and-recycling/ true false%>German company 1177 Lintec is presenting for the first time its specially designed and fully containerised Gussasphalt plant for the European Market, the CDD 1200 GA.

The plant has a capacity of 20tonnes of Gussasphalt per hour (optional up to 20tonnes/hour), and was sold to the French company SMAC (belonging to the 184 Colas Group) and will operate in the west of France near Rennes.

The plant has a hot bin with one chamber and can take 15tonnes of material while the recuperated filler silo is 11tonnes and one or two Gussasphalt silos on load cells are each 6tonnes.

Other components include a quick mixer (1,000kg); integrated bucket (1,000kg); aggregate weigher (800kg) and filler weigher with four inlets (200kg).

“Apart from this special solution Lintec is well-known for fully containerised asphalt and concrete mixing plants. The Lintec product range covers asphalt mixing plants with a capacity from 80-400tonnes and concrete mixing plants with a capacity from 60-240m³/hour,” says Lintec.

The presented Gussasphalt Plant was developed together with Lintec’s partner company Linnhoff & Henne, which will co-exhibit with Lintec and present machinery related to Gussasphalt.

%$Linker: External 0 0 0 oLinkExternal <span class="mouselink">www.lintec-gmbh.de</span> Lintec false http://www.lintec-gmbh.de/ false false%>

Outside: E2 Stand: C036

%$Linker: 2 Internal 2 4824 0 oLinkInternal <span class="oLinkInternal"><span class="oLinkInternal">View more videos</span></span> Video false /event-news/intermat-2012/video/ true false%>

For more information on companies in this article

Related Content

  • Asphaltica exhibition and conference will provide asphalt road knowledge
    October 31, 2012
    The global economy is still suffering, and many believe investment in road and other infrastructure is the key to its revival Over the past 14 years in Italy, only 187km of new highways have been made, but, at the same time, the amount of vehicles using the country’s roads has grown by nearly 10 million. It is in this context of financial concern and growing burden on existing road infrastructure that the sixth edition of ASPHALTICA, the only European event exclusively dedicated to the world of asphalt, bit
  • WN’s steer in right direction
    January 6, 2017
    It might be logical to think that bigger construction machines will be harder to steer – but then there’s the Wacker Neuson DT25 crawler-mounted dumper.
  • WN’s steer in right direction
    March 9, 2012
    It might be logical to think that bigger construction machines will be harder to steer – but then there’s the Wacker Neuson DT25 crawler-mounted dumper.
  • New Putzmeister truck mixer Intermat
    January 6, 2017
    Putzmeister has redeveloped its Pumi truck-mounted rotor pump to improve its performance.