Skip to main content

Lintec presents new Gussasphalt plant for the European Market

German company Lintec will present for the first time its specially designed and fully containerised Gussasphalt plant for the European Market, the CDD 1200 GA. The plant has a capacity of 20tonnes of Gussasphalt per hour (optional up to 20tonnes/hour), and was sold to the French company SMAC (belonging to the Colas Group) and will operate in the west of France near Rennes. The plant has a hot bin with one chamber and can take 15tonnes of material while the recuperated filler silo is 11tonnes and one or tw
April 12, 2012 Read time: 2 mins
Lintec’s new Gussasphalt plant, developed for the European market
%$Linker: 2 Internal 2 4802 0 oLinkInternal <span class="oLinkInternal"><span class="oLinkInternal">RSS</span></span> Road Paving and Recycling false /event-news/intermat-2012/rss/road-paving-and-recycling/ true false%>German company 1177 Lintec is presenting for the first time its specially designed and fully containerised Gussasphalt plant for the European Market, the CDD 1200 GA.

The plant has a capacity of 20tonnes of Gussasphalt per hour (optional up to 20tonnes/hour), and was sold to the French company SMAC (belonging to the 184 Colas Group) and will operate in the west of France near Rennes.

The plant has a hot bin with one chamber and can take 15tonnes of material while the recuperated filler silo is 11tonnes and one or two Gussasphalt silos on load cells are each 6tonnes.

Other components include a quick mixer (1,000kg); integrated bucket (1,000kg); aggregate weigher (800kg) and filler weigher with four inlets (200kg).

“Apart from this special solution Lintec is well-known for fully containerised asphalt and concrete mixing plants. The Lintec product range covers asphalt mixing plants with a capacity from 80-400tonnes and concrete mixing plants with a capacity from 60-240m³/hour,” says Lintec.

The presented Gussasphalt Plant was developed together with Lintec’s partner company Linnhoff & Henne, which will co-exhibit with Lintec and present machinery related to Gussasphalt.

%$Linker: External 0 0 0 oLinkExternal <span class="mouselink">www.lintec-gmbh.de</span> Lintec false http://www.lintec-gmbh.de/ false false%>

Outside: E2 Stand: C036

%$Linker: 2 Internal 2 4824 0 oLinkInternal <span class="oLinkInternal"><span class="oLinkInternal">View more videos</span></span> Video false /event-news/intermat-2012/video/ true false%>

For more information on companies in this article

Related Content

  • Cat boosts mini excavator range at INTERMAT
    March 9, 2012
    Building on its Wacker-Neuson partnering agreement for mini excavator production, Cat is to add two new mini excavators to its range at INTERMAT.
  • JLG’s booming generation
    January 6, 2017
    The 1500SJ is said by manufacturers JLG to be the first straight boom lift that elevates operators to 45.72metres and requires only a weight permit for transport. The telescoping jib, which can extend up to 7.62metres, provides flexibility and what is said to be “exceptional” horizontal and vertical reach. As with all JLG Ultra Booms, the 1500SJ delivers dual 450kg/230kg capacity and three steering modes. Among its features is an LCD display communications machine to assist operators in positioning the plat
  • JLG’s booming generation
    April 12, 2012
    The 1500SJ is said by manufacturers JLG to be the first straight boom lift that elevates operators to 45.72metres and requires only a weight permit for transport. The telescoping jib, which can extend up to 7.62metres, provides flexibility and what is said to be “exceptional” horizontal and vertical reach. As with all JLG Ultra Booms, the 1500SJ delivers dual 450kg/230kg capacity and three steering modes. Among its features is an LCD display communications machine to assist operators in positioning the plat
  • Palfinger launches 30m truck-mounted platform
    January 6, 2017
    Palfinger Platforms has replaced its TKA series access platform with the P300KS. Mounted on a 7.5 tonne truck chassis, the P300KS has a working height of 30m with a maximum outreach to the side or the back of 20.5m. The cage, which offers 540 degrees of rotation, has a maximum load of 350kg.