Skip to main content

Lintec presents new Gussasphalt plant for the European Market

German company Lintec will present for the first time its specially designed and fully containerised Gussasphalt plant for the European Market, the CDD 1200 GA. The plant has a capacity of 20tonnes of Gussasphalt per hour (optional up to 20tonnes/hour), and was sold to the French company SMAC (belonging to the Colas Group) and will operate in the west of France near Rennes. The plant has a hot bin with one chamber and can take 15tonnes of material while the recuperated filler silo is 11tonnes and one or tw
April 12, 2012 Read time: 2 mins
Lintec’s new Gussasphalt plant, developed for the European market
%$Linker: 2 Internal 2 4802 0 oLinkInternal <span class="oLinkInternal"><span class="oLinkInternal">RSS</span></span> Road Paving and Recycling false /event-news/intermat-2012/rss/road-paving-and-recycling/ true false%>German company 1177 Lintec is presenting for the first time its specially designed and fully containerised Gussasphalt plant for the European Market, the CDD 1200 GA.

The plant has a capacity of 20tonnes of Gussasphalt per hour (optional up to 20tonnes/hour), and was sold to the French company SMAC (belonging to the 184 Colas Group) and will operate in the west of France near Rennes.

The plant has a hot bin with one chamber and can take 15tonnes of material while the recuperated filler silo is 11tonnes and one or two Gussasphalt silos on load cells are each 6tonnes.

Other components include a quick mixer (1,000kg); integrated bucket (1,000kg); aggregate weigher (800kg) and filler weigher with four inlets (200kg).

“Apart from this special solution Lintec is well-known for fully containerised asphalt and concrete mixing plants. The Lintec product range covers asphalt mixing plants with a capacity from 80-400tonnes and concrete mixing plants with a capacity from 60-240m³/hour,” says Lintec.

The presented Gussasphalt Plant was developed together with Lintec’s partner company Linnhoff & Henne, which will co-exhibit with Lintec and present machinery related to Gussasphalt.

%$Linker: External 0 0 0 oLinkExternal <span class="mouselink">www.lintec-gmbh.de</span> Lintec false http://www.lintec-gmbh.de/ false false%>

Outside: E2 Stand: C036

%$Linker: 2 Internal 2 4824 0 oLinkInternal <span class="oLinkInternal"><span class="oLinkInternal">View more videos</span></span> Video false /event-news/intermat-2012/video/ true false%>

For more information on companies in this article

Related Content

  • SUMITOMO’s innovative, wide extending asphalt paver screed
    January 6, 2017
    SUMITOMO’s novel new asphalt screed is said to offer wider extension than other designs on the market at present, increasing versatility for the contractor. The firm says that this screed can be extended to 2.5 times its minimum width, compared with twice the width for other existing models available.
  • SUMITOMO’s innovative, wide extending asphalt paver screed
    February 15, 2012
    SUMITOMO’s novel new asphalt screed is said to offer wider extension than other designs on the market at present, increasing versatility for the contractor. The firm says that this screed can be extended to 2.5 times its minimum width, compared with twice the width for other existing models available.
  • Volvo’s new pavers have perkier performance
    January 6, 2017
    The latest tracked asphalt pavers from Volvo Construction Equipment get independent travel drives and electronic traction control to help maintain productivity on slopes and around corners. The P8820C ABG can pave widths from 2.5m up to 13m and handle 1,100tonnes/hour, while the P7820C ABG paves up to 11m and places up to 900tonnes/hour.
  • Volvo’s new pavers have perkier performance
    April 17, 2012
    The latest tracked asphalt pavers from Volvo Construction Equipment get independent travel drives and electronic traction control to help maintain productivity on slopes and around corners. The P8820C ABG can pave widths from 2.5m up to 13m and handle 1,100tonnes/hour, while the P7820C ABG paves up to 11m and places up to 900tonnes/hour.