Skip to main content

Lintec expands manufacturing capacity to meet market demand

German asphalt and concrete plant constructor Lintec is rapidly expanding its manufacturing base around the world to meet growing demand for its modular material production equipment from both well established and emerging markets. The company’s new facility in Poland has recently supplied its first CDD 1200 GA Gussasphalt plant to French company SMAC, part of the Colas Group. However, the company is also enjoying strong demand from facilities in Brazil, Shanghai and Singapore.
January 6, 2017 Read time: 2 mins
German asphalt and concrete plant constructor 1177 Lintec is rapidly expanding its manufacturing base around the world to meet growing demand for its modular material production equipment from both well established and emerging markets.

The company’s new facility in Poland has recently supplied its first CDD 1200 GA Gussasphalt plant to French company SMAC, part of the 184 Colas Group. However, the company is also enjoying strong demand from facilities in Brazil, Shanghai and Singapore.

Lintec will open a new factory in Pune, India by the end of this year to meet demand from Indian contractors.

“In the past we have not concentrated so much on Europe but on emerging markets,” said managing director Carsten Weiss. “But we have had constant growth in Europe over the last four years.”

Lintec’s modular concept, which builds the plant inside easily transportable containers, appeals to both short-term contracts and longer projects.

The completed plant doesn’t require foundations and assembly is rapid, allowing movement between job sites if required. “We call it a project plant, neither mobile or static,” said Lintec sales director Jan Czojor.

%$Linker: External 0 0 0 oLinkExternal <span class="mouselink">www.lintec-gmbh.de</span> Llintec-GmbH false http://www.lintec-gmbh.de/ false false%>

Hall: E2 Stand: C024

%$Linker: 2 Internal 2 4824 0 oLinkInternal <span class="oLinkInternal"><span class="oLinkInternal">View more videos</span></span> Video false /event-news/intermat-2012/video/ true false%>

For more information on companies in this article

Related Content

  • Lintec’s CSM 2500 plant offers low transport costs and quick assembly and disassembly
    January 6, 2017
    Lintec’s new CSM 2500 asphalt mixing plant with parallel drum and conventional screening machine will be on show at bauma. The parallel drum on the plant can be used for hot and cold recycling. Capable of producing 160tonnes/hour, the fully containerised configuration of the CSM 2500 is said by its German manufacturer to ensure lower transport costs and quick and efficient assembly and disassembly. The plant has six screening decks, a 60tonne capacity hot stone bin, a 45tonne reclaimed filler silo, produces
  • GA introduces expanded parts range at INTERMAT 2012
    January 6, 2017
    GA will be introducing a new family of parts at INTERMAT as well as a new range of gaskets. The company makes and sells aftermarket parts for earthmoving machines. It has extended its range to cover Komatsu, Hitachi, Volvo and Liebherr equipment in addition to the parts for Caterpillar machines that it already supplied.
  • GA introduces expanded parts range at INTERMAT 2012
    February 6, 2012
    GA will be introducing a new family of parts at INTERMAT as well as a new range of gaskets. The company makes and sells aftermarket parts for earthmoving machines. It has extended its range to cover Komatsu, Hitachi, Volvo and Liebherr equipment in addition to the parts for Caterpillar machines that it already supplied.
  • Goldhofer’s flexible construction friends
    January 6, 2017
    Making their debut at INTERMAT, German firm Goldhofer will be presenting its range of THP/SL heavy-duty modules as well as its flexible XLE 6 compact system.