Skip to main content

Link deals awarded in Mexico

In Mexico the contractor Ideal has been awarded a package of highway and road works worth a total of US$667 million in all.
February 24, 2012 Read time: 1 min
In Mexico the contractor 3136 Ideal has been awarded a package of highway and road works worth a total of US$667 million in all. The concession package is for a highway measuring 169km and road sections that are 111km and 30km long. The highway connects Guadalajara and Tepic while the 111km road is in Guadalajara and the 30km road is in Tepic. The agreement is for a 48 month construction period with work commencing in January 2012. Ideal is part of the 3135 Carso group and the company will pay $342 million to the authorities now that it has the package of works, with the rest of the payment to come later. Seven firms tendered for the works in all, including ideal.

For more information on companies in this article

Related Content

  • Slow start in 2024 for Wacker Neuson
    May 8, 2024
    Wacker Neuson has seen a slow start in 2024 for sales.
  • New EU-Russian highway connection
    February 18, 2013
    Among the forests and lakes of Finland, one of Europe's newest motorway links is being built as a Green highway linking Europe to Russia - Adrian Greeman reports The road eastwards from Finland's capital Helsinki, along the north coast of the Gulf of Finland, has not carried heavy traffic volumes, at least until recent times. Highway seven as it is designated locally, or E18 in European nomenclature, is partly motorway but in some sections still dual carriageway or even just a single lane each way, finishin
  • Cost reductions on Russian highways
    July 12, 2012
    Major cost reductions are being seen on some key highway projects in Russia including the new ring road project in St Petersburg, where the reduction is US$192.31 million. The management of the ring road in St Petersburg has signed an agreement with the main contractors (Flora, the corporation Inzhtransstroy) to cut costs by 12-17.6% in 2009-2010. The 12% reduction is equivalent to US$32.05 million and will apply to contractors that are to complete facilities in 2009. Meanwhile the 17.6% cut is for work pla
  • STRABAG wins new Romanian dual carriageway deal
    July 27, 2021
    STRABAG has been awarded a major new Romanian dual carriageway deal.