Skip to main content

Lime in asphalt for longer road life

Hydrated lime acts as an anti-stripping additive, helping the bitumen binder to adhere to the aggregate.
By MJ Woof December 10, 2024 Read time: 2 mins
Hydrated lime has been used in the asphalts designed for UK and international airport runways for decades and it is already a permitted, multi-functional additive in the UK’s National Highways asphalt specifications (image © Daniel Kirkegaard Mouritsen/Dreamstime)

Using hydrated lime in asphalt mixes could boost road surface life, according to European research. Adding hydrated lime can benefit the asphalt in numerous ways, helping to improve the climate resilience of asphalt infrastructure according to research from the EU and the US.

Hydrated lime acts as an ‘anti-stripping’ additive, helping the bitumen binder to adhere to the aggregate. It also helps reducing bitumen hardening with age and increasing moisture resistance. At the same time it stiffens the bitumen to reduce rutting, and improves resistance to fracture growth at low temperatures.

Research suggests that adding less than 2% of hydrated lime in the mix could boost asphalt life by up to 25%. This would reduce road wear and extend maintenance intervals, leading to fewer potholes and roadworks.

Hydrated lime has been specified widely particularly in the US for many years as an anti-stripping additive and there, and elsewhere, to increase moisture resistance of asphalts. There’s also proven evidence that it can reduce asphalt ageing by lowering the oxidation of the bitumen binder.

Hydrated lime has been used in the asphalts designed for UK and international airport runways for decades and it is already a permitted, multi-functional additive in the UK’s National Highways asphalt specifications and is in the register of durability improvement options towards achieving their zero carbon target.

Across Europe and the US hydrated lime is used frequently in asphalt and, in some locations, is compulsory because of the durability and performance improvement delivering resilient roads.

Research by the University of Nottingham shows how hydrated lime additions absorb unwanted carbonyls and asphaltenes within bitumen. Adding hydrated lime means that, with ageing, there are fewer oxidative reactions that cause bitumen to become stiffer, more brittle and lead to cracking and deterioration of roads, and development of potholes.

The study compared the performance of mastics containing hydrated lime to those made with granite or limestone fillers alone, and found that in all cases the hydrated lime made the asphalt softer after ageing – or less stiff – than its counterparts with standard filler alone.

Other researchers are now observing a long-term case study on asphalt that was laid on a stretch of the A38 near Burlescombe in Devon in 2021.

Related Content

  • Advances in road milling technology
    June 4, 2019
    New systems developed for the road milling machine market will boost safety and efficiency
  • CEMEX supplying materials for highway project in Houston, TX
    April 12, 2021
    CEMEX is supplying materials for a major highway project in Houston, TX.
  • Rainforest road repair and rehabilitation with stabilisation
    May 23, 2014
    A limited amount of aggregate and resources, including fuel, in the Riau province of Indonesia can challenge roadbuilders, but Indonesian contractor PT Harap Panjang overcame the obstacles on a recent project. The province rests in a tropical rainforest. The 2600mm of annual rainfall take a toll on the area’s roads, particularly those developed by oil company Chevron Pacific Indonesia. The remote roads were built to service Chevron operations, crucial to the economies of the city, region and country. The r
  • Recycling concrete runway saves time, money
    February 17, 2012
    Nashville International Airport in the US state of Tennessee has revamped its facilities following extensive upgrades being carried out on its oldest runway in a project worth some US$23 million. The airport authorities realised that to improve both capacity and safety a major improvement of runway 2L-20R was required, with full-depth reconstruction needed to provide the necessary structural strength and working life. Engineering firm Garver Aviation worked on the project to rehabilitate the portion of Runw