Skip to main content

Liebherr is offering a versatile and mobile new concrete mixing plant

Liebherr’s new Mobilmix 2.5 is a container-mounted mixing plant system developed for large construction sites. This plant offers a capacity of 110m3/hour of compacted concrete and is designed for mobility. The plant’s components are housed in modular containers that can be easily transported and linked together on-site. Once erected, the container modules form a weather-proof structure that can be equipped with additional insulation for use in severe climatic conditions.
January 6, 2017 Read time: 1 min
718 Liebherr’s new Mobilmix 2.5 is a container-mounted mixing plant system developed for large construction sites.

This plant offers a capacity of 110m 3 /hour of compacted concrete and is designed for mobility.

The plant’s components are housed in modular containers that can be easily transported and linked together on-site. Once erected, the container modules form a weather-proof structure that can be equipped with additional insulation for use in severe climatic conditions.

Two Mobilmix 2.5 plants can be operated in tandem, effectively doubling output to 220m3/hour if required. The mixing plant can be extended with high-pressure mixer cleaning equipment, admixture weighers, dust filters and water tanks.

%$Linker: External 0 0 0 oLinkExternal www.liebherr.com Liebherr false http://www.liebherr.com/ false false%>

%$Linker: 2 Internal 2 4824 0 oLinkInternal <span class="oLinkInternal"><span class="oLinkInternal">View more videos</span></span> Video false /event-news/intermat-2012/video/ true false%>

For more information on companies in this article

Related Content

  • CTE’s ideal platform
    January 6, 2017
    A new truck mounted articulated platform with increased capacity up to 300kg and 21metre working height with 10metre outreach is being launched by CTE at Intermat 2012. The ZED 21 JH, part of the firm’s established ZED line, is said to be an evolution of the ZED 21 J with a redesigned boom that is more compact and parallel to the articulated arm. The new model’s jib inclination has been increased from 110 ° to 145 °, its controls are tilted towards the operator to improve visibility and ease of use, and the
  • CTE’s ideal platform
    April 12, 2012
    A new truck mounted articulated platform with increased capacity up to 300kg and 21metre working height with 10metre outreach is being launched by CTE at Intermat 2012. The ZED 21 JH, part of the firm’s established ZED line, is said to be an evolution of the ZED 21 J with a redesigned boom that is more compact and parallel to the articulated arm. The new model’s jib inclination has been increased from 110 ° to 145 °, its controls are tilted towards the operator to improve visibility and ease of use, and the
  • SUMITOMO’s innovative, wide extending asphalt paver screed
    January 6, 2017
    SUMITOMO’s novel new asphalt screed is said to offer wider extension than other designs on the market at present, increasing versatility for the contractor. The firm says that this screed can be extended to 2.5 times its minimum width, compared with twice the width for other existing models available.
  • SUMITOMO’s innovative, wide extending asphalt paver screed
    February 15, 2012
    SUMITOMO’s novel new asphalt screed is said to offer wider extension than other designs on the market at present, increasing versatility for the contractor. The firm says that this screed can be extended to 2.5 times its minimum width, compared with twice the width for other existing models available.