Skip to main content

Libyan deal for STRABAG

A consortium headed by STRABAG will handle a highway contract in Libya worth €104 million.
February 23, 2012 Read time: 1 min
A consortium headed by 945 Strabag will handle a highway contract in Libya worth €104 million. The project is for the upgrade of the coastal highway between Ras Ejdir and Garaboulli in Libya, as well as the construction of the Tripoli Western Access. In total, 103km of dual-carriage and 97km of single-carriage roadway will be built. Work is already underway and is due for completion in June 2013. STRABAG's share is some 60% of the deal, around €62 million, with the rest split with its local partner.

For more information on companies in this article

Related Content

  • Highway work boost in North Africa
    August 21, 2012
    North Africa is seeing construction business return - Mike Woof reports After a troubled period, stability looks to be returning to North African nations, which can only be good for the road construction sector. First Tunisia, then Egypt and finally Libya saw tumultuous revolts against the previous autocratic (and in one case at least, despotic) rulers. All three nations are now benefiting from a return to stability, with economic growth also improving once more.
  • Strabag picks up Czech D1 motorway deal
    December 21, 2018
    Strabag is to modernise nearly 15km of the D1 motorway in the Czech Republic under a contract worth nearly €73 million. Work includes complete renewal of the cement concrete surface between Velký Beranov and Měřín to be done within three years. Working on the project are the consortium leader Strabagm based in Austria, and its two partner companies Metrostav and EUROVIA’s Czech subsidiary. The project will begin with a temporary widening of the motorway in the direction of Prague to allow full reno
  • Strabag wins Polish A1 motorway deal for Wozniki-to-Pyrzowice section
    September 2, 2015
    Strabag consortium has signed a contract for construction of a 15.2km section of the A1 motorway between Wozniki and Pyrzowice. Completion of the section that will connect Pyrzowice with Czestochowa is due by the end of 2018. It is the first of four contracts signed for construction of the motorway. Strabag’s offer is believed to be around €144 million, while the budget set by the General Directorate for National Roads and Motorways (GDDKiA), was set just over €200 million. Meanwhile, the S6 dual car
  • Strabag leads consortium for planned Polish project
    July 24, 2014
    Austrian contractor Strabag will lead the consortium constructing a stretch of the S7 expressway in Poland. Strabag is teaming up with Heilit+Woerner for the project to build the Trasa Nowohucka section of the S7 linking Rybitwy and Igołomska and lying to the east of Kraków. Construction work is commencing in August/September 2014 and the contract is worth around €130 million. The consortium is handling the upgrading and construction work for some 18.6km of roads in all. The work includes widening a 4.5km l