Skip to main content

Leica believes that digitisation is the key to improving efficiency and lowering costs

The digitisation of the construction process will give greater transparency on costs at the site and ultimately lead to improved productivity and efficiency in the industry, said Johan Arnberg, president of Leica Geosystems Machine Control Division, speaking at a Leica roundtable on digitisation of the construction industry held at bauma. The data gathered by the new generation of digitised construction machines and tools will enable contractors and owners for the first time to put key performance indicator
April 20, 2016 Read time: 2 mins
Johan Arnberg, Katherine Broder, Bradley Jacobs and Sten Kristensen of Leica Geosystems

The digitisation of the construction process will give greater transparency on costs at the site and ultimately lead to improved productivity and efficiency in the industry, said Johan Arnberg, president of 265 Leica Geosystems Machine Control Division, speaking at a Leica roundtable on digitisation of the construction industry held at bauma. The data gathered by the new generation of digitised construction machines and tools will enable contractors and owners for the first time to put key performance indicators in place to enable them to monitor and analyse progress and identify problems and possibilities for improved processes.

The major cost of construction projects tends to be in the execution phase.

Digitisation will provide the data for projects to be planned more carefully and in more detail. As a result, the planning phase may become longer, but the execution phase will be shorter through greater efficiency and less mistakes, said Arnberg.

A concern often raised in discussions of digitisation is that machines and tools will become too complex for operators. Arnberg countered this by explaining that although Leica had started out as an engineering-led company, it had transformed itself into a customer-led company, so operators have an important input into the development of its products. Katherine Broder, vice-president, Leica Geosystems Tools Division, agreed that tools need to be simple for operators and said that Leica had been working towards this for the past seven years. Bradley Jacobs, program manager – software for Leica Geosystems Machine Control Division, added that the company hides the complexity of its technology behind simple user interfaces.

Digitisation is likely to happen at different rates in different countries, said Sten Kristensen, director of product management for Leica Geosystems Machine Control Division. There needs to be an underlying infrastructure in place that can support digital machines and tools, and this is at different stages in different regions. Progress is likely to be rapid in areas such as Scandinavia, the UK and Japan.

For more information on companies in this article

Related Content

  • Key technology moves for Leica Geosystems
    July 9, 2024
    Leica Geosystems is developing its product offerings with key moves.
  • US DOTs in critical funding battle
    February 9, 2012
    In the US, state DOTs are preparing for the upcoming reauthorisation battle in a tough economic and political climate. Set to expire by the end of the year, the bill is a critical funding source for many transportation projects in the US. However transportation officials in the US are facing a tough battle as the political and economic climate has changed considerably since the last reauthorisation was passed, shortly after President Obama's inauguration in January 2009. Since then, the recession has contin
  • Certified safe: ARTBA president talks future highways and safety
    January 16, 2020
    What keeps Dave Bauer* up at night? David Arminas caught up with the head of ARTBA at his Washington D.C. office during daylight hours
  • Optimised machines improve aggregate production
    February 27, 2012
    Improving aggregate production and quality levels is not just about investing in the latest equipment but making sure existing machines are optimised - Claire Symes reports. Although the cost of fuel has dropped since last summer's high, reducing the cost/tonne of production is still high on the agenda for most quarry operators, along with improving quality.