Skip to main content

Legal tangle over Polish highway project

The complex legal tangle over Poland's troubled A2 highway project is continuing to develop.
February 29, 2012 Read time: 1 min
The complex legal tangle over Poland's troubled A2 highway project is continuing to develop. The Polish road authority, 1361 GDDKiA, has launched a legal bid for compensation from the Chinese construction firm 2487 COVEC, which had a contract to build a number of sections of the highway. COVEC was hit by spiralling materials costs once work started and was forced to relinquish its contract for the project by the Polish authorities after failing to meet construction deadlines. However COVEC has also launched a counter-suit against GDDKiA for compensation for its losing the contract. The size of COVEC's compensation claim from GDDKiA has not been revealed. However GDDKiA is said to be asking for ?200 million compensation from COVEC. The legal case looks likely to rumble on through the Polish courts for some time. There is also a risk of further or additional action in Europe's courts from other parties involved in this complex legal dispute. COVEC is a subsidiary of 890 China Railway Group Limited.

For more information on companies in this article

Related Content

  • STRABAG wins tricky Polish project
    March 21, 2012
    Austrian construction firm STRABAG has won a major road contract from Poland’s General Directorate for National Roads and Highways (GDDKiA). The deal is for the construction of a 40km section of the S8 Expressway between Walichnowy and Sieradz Poùudnie, some 240km to the south west of capital Warsaw.
  • Major Polish highway projects being planned
    October 12, 2015
    Work on a series of major road projects is now gathering pace. The Polish General Directorate for National Roads and Motorways (GDDKiA) is signing contracts worth over €753.55 mIllion for the construction of two S7 dual carriageway sections. These will form part of the Gdansk-Warsaw route. Czech firm Metrostav will build the 20km section between Koszwaly and Nowy Dwor Gdanski. And Budimex will construct the 19km section between Nowy Dwor Gdanski and Kazimierzowo.
  • Poland: €7.57bn road budget call
    February 20, 2012
    The Polish highway authorities are calling for a road budget of e7.57 billion for 2011, and while this will have to be approved by the government, it is some e1.56 billion lower than originally planned.
  • Polish projects planned to expand network
    January 10, 2018
    The authorities in Poland plan to expand the country’s road network by a total of 3,268km by 2025. The Polish national road authority GDDKiA says that this plan is likely to cost some €31.61 billion. The road development plan will run until 2025 as part of Poland’s National Road Construction Programme. The road development work includes adding 252.2km of highways, 2,641km of dual carriageways and over 369km of ring roads. Poland has been steadily improving and expanding its road network and in 2017