Skip to main content

Legacy Way underground road tunnel in Brisbane to cost US$1.57bn

The 5km Legacy Way underground road tunnel in Brisbane, Australia will cost US$1.57 billion (AUD 1.50bn). Brisbane City Council (BCC) will borrow US$ 1.04 billion (AUD 1bn) from the Queensland Treasury Corporation (QTC) on a 30-year loan to help fund the works. Meanwhile the federal government will contribute US$520.92 million (AUD 500mn) to the project. The tunnel is expected to carry 24,000 cars a day when it opens in 2015. The Clem 7 and Airport Link are two tunnels already operating in Brisbane.
November 21, 2012 Read time: 1 min
The 5km Legacy Way underground road tunnel in Brisbane, Australia will cost US$1.57 billion (AUD 1.50bn).

Brisbane City Council (BCC) will borrow US$ 1.04 billion (AUD 1bn) from the 6912 Queensland Treasury Corporation (QTC) on a 30-year loan to help fund the works. Meanwhile the federal government will contribute US$520.92 million (AUD 500mn) to the project. The tunnel is expected to carry 24,000 cars a day when it opens in 2015. The Clem 7 and Airport Link are two tunnels already operating in Brisbane.

For more information on companies in this article

Related Content

  • New Zealand road earthquake damage bill nears NZD 1bn
    August 29, 2012
    The cost of rebuilding New Zealand roads damaged by earthquakes in Canterbury and Christchurch has reached almost NZD 1bn (US $808.04 million). It is reported that the money might have to come from the government's NZD 9bn budget to fund the country's land transport plans for the next three years.
  • Seattle’s Alaskan Way tolls to be kept to a minimum
    June 4, 2018
    Drivers could pay as little as US$1 to use Seattle’s 2.7km Alaskan Way tunnel when it opens, likely by the end of the year. The Washington State Department of Transportation, owner of the tunnel, are considering several rates depending on time of day and day of week, according to local media. The DoT said funding for the $3.2 billion viaduct replacement programme comes from state, federal and local sources as well as the Port of Seattle and tolls on drivers using the tunnel. The money will fund tunnel
  • Seattle’s Alaskan Way tolls to be kept to a minimum
    June 4, 2018
    Drivers could pay as little as US$1 to use Seattle’s 2.7km Alaskan Way tunnel when it opens, likely by the end of the year. The Washington State Department of Transportation, owner of the tunnel, are considering several rates depending on time of day and day of week, according to local media. The DoT said funding for the $3.2 billion viaduct replacement programme comes from state, federal and local sources as well as the Port of Seattle and tolls on drivers using the tunnel. The money will fund tunnel
  • Astec’s Shuttle Buggy lands in Australia
    March 5, 2024
    Performance reliability of the Roadtec SB-3000 Material Transfer Vehicle was a key factor in the contractor Boral’s decision to use it for paving work on the Western Sydney Airport Project.